首页 | 本学科首页   官方微博 | 高级检索  
     检索      

冻土沼泽地区的管道维抢修方法
引用本文:李增彬,张世斌.冻土沼泽地区的管道维抢修方法[J].油气储运,2013(10):1138-1140.
作者姓名:李增彬  张世斌
作者单位:中国石油管道公司加格达奇输油气分公司,黑龙江加格达奇165000
摘    要:为增强冻土沼泽地区的管道应急抢险能力,根据冻土沼泽的特点,提出了一套包括挖渠布栏、浮船拖拽、彩钢板道路、沉箱支固的冻土沼泽管道维抢修方法.其中,在拦油渠内布设围油栏,通过两层甚至多层挖渠布栏,在层间挖设集油坑将汇集的油品集中抽至储油囊回收的方法为国内外首次采用.结合管道冻土沼泽地区植被丰富,承载力强的特点,自行制作旱船,解决了大型设备进场难的问题.结合管道维抢修实际需求研制的新型钢制沉箱,可折叠、易运输,而且能够有效地支固作业坑和防水.该套方法的可行性在漠河-大庆原油管道沼泽地区的维抢修演练中得到了验证.

关 键 词:冻土沼泽  管道  污油收控  维抢修

Pipeline maintenance and repair methods in frozen soil and boggy areas
Li ZengbinJiagedaqi Oil & Gas Transmission Sub-company,PetroChina Pipeline Company,Jiagedaqi,Heilongjiang,Zhang Shibin.Pipeline maintenance and repair methods in frozen soil and boggy areas[J].Oil & Gas Storage and Transportation,2013(10):1138-1140.
Authors:Li ZengbinJiagedaqi Oil & Gas Transmission Sub-company  PetroChina Pipeline Company  Jiagedaqi  Heilongjiang  Zhang Shibin
Institution:(Jiagedaqi Oil & Gas Transmission Sub-company, PetroChina Pipeline Company, Jiagedaqi, Heilongjiang, 165000)
Abstract:In order to improve the emergency repair capacity for pipelines in frozen soil and boggy areas,according to the characteristics of frozen soil and boggy areas,the paper puts forward a series of methods for pipeline maintenance and rush repair,including digging canals and arranging hurdles,dragging pontoon,color plate road and caisson support.Among them,the method of arranging surrounding oil hurdle,by digging 2 or more layers of canals,digging oil collecting pits between layers and pumping the collected oil to the oil storage bursa for recycling is used at home and abroad for the very first time.In view of such characteristic of frozen soil and boggy areas as rich vegetation and strong bearing capability,a kind of land boat is manufactured,to solve the problem of the access of heavy-duty equipment to the site.A new foldable steel caisson developed according to the actual need of maintenance and rush repair,foldable and easy to transport,can effectively support and fix the operating pits and proof water.The feasibility of the series of method has been verified in the drill of maintenance and rush repair in boggy areas of Mohe-Daqing Oil Pipeline.(6 Figures,4 References)
Keywords:frozen soil and boggy  pipeline  waste oil recovery and control  maintenance and rush repair
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号