首页 | 本学科首页   官方微博 | 高级检索  
     检索      

飞来峡18#坝段坝顶水平位移安全
引用本文:朱劭宇.飞来峡18#坝段坝顶水平位移安全[J].中国农村水利水电,2006,0(9):91-93.
作者姓名:朱劭宇
作者单位:广东省飞来峡水利枢纽管理局,511825
摘    要:飞来峡水利枢纽是以防洪为主的大型水利工程,利用观测资料建立数学模型并确定安全监控指标,对于工程安全运行及防洪调度具有重要意义。叙述了混合模型建立的基本原理和方法。运用弹塑性理论,采用平面有限元计算模拟了蓄水过程,分析研究了飞来峡大坝18#坝段坝顶水平位移在各种可能水位组合情况下的变化规律,建立了坝顶水平位移与上下游水位的确定性关系模型,利用实测资料建立了该坝段坝顶水平位移的混合模型。经检验,模型质量较好。利用混合模型拟定了安全监控指标,并据此反演了该坝段混凝土弹性模量。所建立的安全监控指标和反演的坝体弹性模量可为枢纽工程安全运行及防洪调度提供重要依据。

关 键 词:混凝土坝  水平位移  安全监控指标  有限元法
文章编号:1007-2284(2006)09-0091-03
收稿时间:2006-05-18
修稿时间:2006-05-18

Determination of Safety-Monitoring Index for the Feilaixia Section No.18 Dam Crest Horizontal Displacement
ZHU Shao-yu.Determination of Safety-Monitoring Index for the Feilaixia Section No.18 Dam Crest Horizontal Displacement[J].China Rural Water and Hydropower,2006,0(9):91-93.
Authors:ZHU Shao-yu
Institution:Feilaixia Wa ter Conservancy Project Management Bureau, Qingyuan 511825, Guangdong Province, China
Abstract:Feilaixia hydro-project is a large-scaled hydraulic engineering for flood control. The observed data are used to establish mathematical model and determine safety-monitoring index, which has the vital significance regarding the project safe operation and the flood control. The principles and methodologies for a mixed model are depicted. The elastic-plastic theory and the plane finite element method are used to simulate the water storing process, and to analyze the change law of horizontal displacement of Feilaixia Section No. 18 with different water level combination. The relationship model between the dam crest horizontal displacement and the water levels of upstream and downstream has been established. Using observation data, the mixed model of the dam crest horizontal displacement is determined. Through test, the quality of the model established is verified, the safety-monitoring index has been determined, and the dam body elastic module is calculated according to the above results. The safety monitoring index and the dam body elastic module may provide the important gist for the project safety operation and the flood control.
Keywords:concrete dam  horizontal displacement  safety-monitoring index  FEM
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《中国农村水利水电》浏览原始摘要信息
点击此处可从《中国农村水利水电》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号