首页 | 本学科首页   官方微博 | 高级检索  
     

Study on the Projects of the Daily Regulation of Jinghong Hydroelectric Station on Lancang River
引用本文:WANG Yun - li,LIU Ya - hui,SHI Yong -yan. Study on the Projects of the Daily Regulation of Jinghong Hydroelectric Station on Lancang River[J]. 保鲜与加工, 2006, 0(5): 43-46
作者姓名:WANG Yun - li  LIU Ya - hui  SHI Yong -yan
作者单位:1. Chongqing Southwest Hydro Engineering Research Institute for Waterway, Chongqing 400016, P. R. China; 2. Chongqing Communication Research Design Institute, Chongqing 400067, P. R. China
摘    要:The one dimension mathematical model has been adopted to study the projects of the daily regulation of hydroelectric station: the implicit format of Preissmann has been adopted to solve the equation.The program of one dimension unsteady flow has been worked out.The result of calculation of the program has been verified by the result of the physical model and the coincide well.Under 4 kinds of projects of the daily regulation of Jinghong Hydroelectric Station,the unsteady flow conditions in lower reaches of the dam with the length of about 85km have been calculated by the program.The graph has been adopted to analyze the important characteristic parameters of the unstable flow conditions of 4 kinds of projects: the range of water level per day,the range of water level per hours and the range of water level per 20 minutes.Finally,the project of the daily regulation of Jinghong Hydroelectric Station which has a smallest influence on the navigable flow conditions has been obtained.

关 键 词:mathematical model  one dimension unsteady flow  characteristic parameters  navigable flow conditions  comparison of projects  
收稿时间:2006-05-15
修稿时间:2006-05-15

Study on the Projects of the Daily Regulation of Jinghong Hydroelectric Station on Lancang River
WANG Yun - li,LIU Ya - hui,SHI Yong -yan. Study on the Projects of the Daily Regulation of Jinghong Hydroelectric Station on Lancang River[J]. Storage & Process, 2006, 0(5): 43-46
Authors:WANG Yun - li  LIU Ya - hui  SHI Yong -yan
Affiliation:1. Chongqing Southwest Hydro Engineering Research Institute for Waterway, Chongqing 400016, P. R. China; 2. Chongqing Communication Research Design Institute, Chongqing 400067, P. R. China
Abstract:The one dimension mathematical model has been adopted to study the projects of the daily regulation of hydroelectric station: the implicit format of Preissmann has been adopted to solve the equation.The program of one dimension unsteady flow has been worked out.The result of calculation of the program has been verified by the result of the physical model and the coincide well.Under 4 kinds of projects of the daily regulation of Jinghong Hydroelectric Station,the unsteady flow conditions in lower reaches of the dam with the length of about 85km have been calculated by the program.The graph has been adopted to analyze the important characteristic parameters of the unstable flow conditions of 4 kinds of projects: the range of water level per day,the range of water level per hours and the range of water level per 20 minutes.Finally,the project of the daily regulation of Jinghong Hydroelectric Station which has a smallest influence on the navigable flow conditions has been obtained.
Keywords:mathematical model  one dimension unsteady flow  characteristic parameters  navigable flow conditions  comparison of projects  
点击此处可从《保鲜与加工》浏览原始摘要信息
点击此处可从《保鲜与加工》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号