首页 | 本学科首页   官方微博 | 高级检索  
     


PCB in a River System During Sediment Remediation
Authors:Bremle  Gudrun  Larsson  Per  Hammar  Tommy  Helgée  Anders  Troedsson  Bo
Affiliation:1. Ecotoxicology, Departement of Ecology, Lund University, 223 62, Lund, Sweden
2. County Administration of Kalmar, S-391 86, Kalmar, Sweden
3. Municipality of Hultsfred, Sweden
4. Municipality of Vetlanda, Sweden E-mail
Abstract:Remediation of 150 000 m3 of sediment containing400 kg PCB was performed by suction dredging in asmall lake in Sweden in the summers of 1993 and 1994.Upon project completion calculations indicated that97% of the PCB was deposited in a landfill withsubsequent low transport to the surroundings, andthat 2.9 kg was left in the lake sediment.Concentrations of PCB that were measured weekly in thewater leaving the lake were 12 ng/L (geometric mean)during dredging, not exceeding 30 ng/L and notsignificantly higher than in investigations preceedingthe remedial action. The concentration of PCB wasnegatively correlated to water discharge andpositively correlated to water temperature. PCBtransport in the river was correlated to waterdischarge but not to the dredging activity. Duringdredging of the most contaminated part of the lake,the dredging area was screened off by a geotextilesilt curtain that reduced leakage of PCB to the riverdownstream.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号