首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Dynamic Construction Mechanical Behavior of a Deeply Buried Intersection Tunnel
Abstract:Excavation of an intersection tunnel between independent double tunnels leads again to stress release and redistribution in the surrounding rock and the support structure of the chief tunnel, resulting in change of mechanical behavior of the rock mass an
Keywords:
点击此处可从《保鲜与加工》浏览原始摘要信息
点击此处可从《保鲜与加工》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号