首页 | 本学科首页   官方微博 | 高级检索  
     检索      

井灌区机井取水量定额管理下的地下水动态模拟
引用本文:叶水根,叶皓研,张成龙,李枫.井灌区机井取水量定额管理下的地下水动态模拟[J].中国农业大学学报,2018,23(11):152-160.
作者姓名:叶水根  叶皓研  张成龙  李枫
作者单位:中国农业大学 水利与土木工程学院, 北京 100083,北京良乡蓝鑫水利工程设计所, 北京 102401,中国农业大学 水利与土木工程学院, 北京 100083,北京良乡蓝鑫水利工程设计所, 北京 102401
基金项目:全球环境基金(GEF)海河流域水资源与水环境综合管理项目;北京市房山区水资源与水环境综合管理规划(bj3-5)
摘    要:针对华北平原农业灌溉地下水超采的问题,以房山节水示范区为例,采用机井取水量定额管理的方法,基于水文地质模型软件GMS,对示范区地下水位进行模拟研究。结果表明:取水量定额管理后,示范区2020年模拟的地下水位比现状回升了3.34m,比按现状取水量模拟的地下水位多回升了1.49m。机井取水量定额管理可以提高地下水位的回升力度,是实现区域地下水采补平衡的有效措施。

关 键 词:地下水超采  水文地质模型  取水量定额管理  地下水位恢复
收稿时间:2018/3/17 0:00:00

Simulation of groundwater dynamics under water quota management in well irrigation area
YE Shuigen,YE Haoyan,ZHANG Chenglong and LI Feng.Simulation of groundwater dynamics under water quota management in well irrigation area[J].Journal of China Agricultural University,2018,23(11):152-160.
Authors:YE Shuigen  YE Haoyan  ZHANG Chenglong and LI Feng
Institution:College of Water Resources and Civil Engineering, China Agricultural University, Beijing 100083, China,Beijing Liangxiang Lanxin Design Institute of Water Conservancy, Beijing 102401, China,College of Water Resources and Civil Engineering, China Agricultural University, Beijing 100083, China and Beijing Liangxiang Lanxin Design Institute of Water Conservancy, Beijing 102401, China
Abstract:Aiming at the problem of groundwater overexploitation in North China Plain, a case of water-saving demonstration area in Fangshan, where the situation of groundwater overexploitation is serious, is investigated using the method of the water supply quota management of well. A groundwater simulation software GMS was used to simulate groundwater in water-saving demonstration area. The results showed that:After the water supply quota management, the simulated groundwater level in the demonstration area in 2020 would be recovered to 3.34 m, which is 1.49 m higher than the current management simulated groundwater level. Quota management can improve the strength of underground water level recovery and is one of the effective measures of groundwater dynamic balance.
Keywords:groundwater overexploitation  hydrogeological model  water quota management  groundwater level recovery
本文献已被 CNKI 等数据库收录!
点击此处可从《中国农业大学学报》浏览原始摘要信息
点击此处可从《中国农业大学学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号