首页 | 本学科首页   官方微博 | 高级检索  
     检索      

路桥过渡段施工问题研究
引用本文:李晓静.路桥过渡段施工问题研究[J].湖南农机,2009,36(5).
作者姓名:李晓静
作者单位:河北路桥高速公路养护有限公司,河北,石家庄,050000
摘    要:在路桥过渡段施工时,会因基础不同、防水措施不足、施工质量等问题产生显著的沉降差异,从而引起桥头跳车现象.路桥过渡段的施工,应做好施工勘察设计工作、处理好软性地基、选好台后填筑材料、做好台背排水、压实填土,减少台后路基的沉降.提高路基的刚度,尽力实现路桥刚柔平稳过渡,达到防治桥台跳车的目的.

关 键 词:路桥过渡段  不均匀沉降  桥头跳车

Study on the construction of road-bridge transitional section
LI Xiao-jing.Study on the construction of road-bridge transitional section[J].Hunnan Agricultural Machinery,2009,36(5).
Authors:LI Xiao-jing
Institution:Hebei Road-bridge Highway Maintenance Limited Company;Shijiazhuang;Hebei 050000;China
Abstract:Because of roadbase, waterproof, quality of road, vehicle will jump at the road-bridge transitional section. When building at the road-bridge transitional section, we should do good investigate, make soft road harder, drain water from roadbed in order that the vehicle will not jump at the road-bridge transitional section.
Keywords:road-bridge transitional section  uneven subside  vehicle jump at the end of bridge  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号