Affiliation:State Key Laboratory of Coal Mine Disaster Dynamics and Control; College of Resource and Environmental Sciences; State and Local Joint Engineering Laboratory of Methane Drainage in Complex Coal Gas Seam, Chongqing University, Chongqing 400044, China;State Key Laboratory of Coal Mine Disaster Dynamics and Control; College of Resource and Environmental Sciences, Chongqing University, Chongqing 400044, China;State Key Laboratory of Coal Mine Disaster Dynamics and Control; College of Resource and Environmental Sciences, Chongqing University, Chongqing 400044, China
Abstract:Yangla copper mine is going to build a new tailings pond for its tailings disposal. The tailings dam is 185.0 m high and centerline method is used to construct the tailings pond. For the stability of the tailings dam, 2D FLOW program is used for the numerical simulation study about the dam seepage. During simulation calculation, different conditions which include a drainage system installed into the dam or not and different beach widths, i.e. 70 (the flood condition), 100, 300 m (the normal condition), are considered. Through calculation, the change of the seepage under different conditions is obtained, which shows if the drainage system is installed into the tailings dam, the underground water can be successfully drained out. This can keep the phreatic surface level relatively low, so as to improve the stability of the dam.
Keywords:tailings   dams   seepage   computer simulation   centerline method
点击此处可从《保鲜与加工》浏览原始摘要信息
点击此处可从《保鲜与加工》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号