哈尔滨松花江斜拉大桥9#主塔承台施工
引用本文:汤赐勇,陈亮,刘万昌,张春生,陈阽陪. 哈尔滨松花江斜拉大桥9#主塔承台施工[J]. 森林工程, 2002, 18(6): 54-55
作者姓名:汤赐勇  陈亮  刘万昌  张春生  陈阽陪
作者单位:黑龙江省路桥建设集团
摘    要:大体积砼浇筑、冬季施工、水中作业是桥梁施工的难点,通过哈尔滨松花江斜拉大桥9^#主塔承台实施实践,分析总结了这三个施工工艺,从而为指导桥梁施工提供了参考。

关 键 词:哈尔滨松花江斜拉大桥 主塔承台 施工 冬季施工 基坑开挖 大体积砼浇筑
修稿时间:2002-07-08

Main tower No. 9'' s base slab construction of cable stayed bridge over Songhuajiang river in Harbin City
Tang Tiyong Chen Liang Liu Wanchang etc.. Main tower No. 9'' s base slab construction of cable stayed bridge over Songhuajiang river in Harbin City[J]. Forest Engineering, 2002, 18(6): 54-55
Authors:Tang Tiyong Chen Liang Liu Wanchang etc.
Affiliation:Tang Tiyong Chen Liang Liu Wanchang etc.
Abstract:Mass concrete pouring construction in winter and underwater operation are the difficulties in bridge construction. Through practice of main tower No.9's base slab constrution of cable-stayed bridge over the Songhuajiang river in Haerbin, the authors analysed and summarized these three construction techniques.
Keywords:Well point method  Mass concrete  Constuction in winter