Congestion Management Analysis Based on Flow Gate Rights
引用本文:SHI Jiang-ling,YU Ji-hui,ZHANG Qian,PENG Guang-jin. Congestion Management Analysis Based on Flow Gate Rights[J]. 保鲜与加工, 2007, 0(3): 39
作者姓名:SHI Jiang-ling  YU Ji-hui  ZHANG Qian  PENG Guang-jin
作者单位:Key Laboratory of High Voltage Engineering and Electrical New Technology, Ministry of Education, Electrical Engineering College of Chongqing University, Chongqing 400030, China
摘    要:In order to alleviate the congestion economically and effectually under the competitive circumstance of electricity market,an applied method of congestion management,which based on FGR(Flow Gate Rights),has been proposed.The share of line has been used to define the power plant's influence on congestion.The proportional principle has been used to compute local marginal price.Then they are both used to balance the charge of FGR.The ISO(Independent System Operator) will dispatch the system to meet the FGR holders' rights.This method is used to alleviate congestion effectually,activate power plants to take part in scheduling positively,and level off the price.An instance is used to illustrate the feasibility of this method with FGR.

关 键 词:electricity market   congestion management   flow gate rights
修稿时间:2006-11-14

Congestion Management Analysis Based on Flow Gate Rights
SHI Jiang-ling,YU Ji-hui,ZHANG Qian,PENG Guang-jin. Congestion Management Analysis Based on Flow Gate Rights[J]. Storage & Process, 2007, 0(3): 39
Authors:SHI Jiang-ling  YU Ji-hui  ZHANG Qian  PENG Guang-jin
Affiliation:Key Laboratory of High Voltage Engineering and Electrical New Technology, Ministry of Education, Electrical Engineering College of Chongqing University, Chongqing 400030, China
Abstract:In order to alleviate the congestion economically and effectually under the competitive circumstance of electricity market,an applied method of congestion management,which based on FGR(Flow Gate Rights),has been proposed.The share of line has been used to define the power plant's influence on congestion.The proportional principle has been used to compute local marginal price.Then they are both used to balance the charge of FGR.The ISO(Independent System Operator) will dispatch the system to meet the FGR holders' rights.This method is used to alleviate congestion effectually,activate power plants to take part in scheduling positively,and level off the price.An instance is used to illustrate the feasibility of this method with FGR.
Keywords:electricity market   congestion management   flow gate rights
点击此处可从《保鲜与加工》浏览原始摘要信息
点击此处可从《保鲜与加工》下载全文