首页 | 本学科首页   官方微博 | 高级检索  
     

Influence study of constructed rapid infiltration system constructedby purple soil on sewage Nitrogen removal performance
作者姓名:WANG Chun yan  GUO Jin song  WANG Fei and TANG Yi
作者单位:Key Laboratory of Three Gorges Reservoir Region's Eco Environment of Ministry Education; Faculty of Urban Construction and Environment Engineering,Chongqing University, Chongqing 400030, P.R. China;Key Laboratory of Three Gorges Reservoir Region's Eco Environment of Ministry Education; Faculty of Urban Construction and Environment Engineering,Chongqing University, Chongqing 400030, P.R. China;Key Laboratory of Three Gorges Reservoir Region's Eco Environment of Ministry Education; Faculty of Urban Construction and Environment Engineering,Chongqing University, Chongqing 400030, P.R. China;Key Laboratory of Three Gorges Reservoir Region's Eco Environment of Ministry Education,Chongqing University, Chongqing 400030, P.R. China
摘    要:The nitrogen removal performance of a constructed rapid infiltration system (CRI) constructed using the common purple soil and sand from the Three Gorges Reservoir Region in the P.R. China was studied. In order to optimize the construction and the nitrogen removal performance of the CRI, three 1.5 m high columns were examined using mixed media with soil/sand ratios of 2∶1, 3∶1 and 4∶1, respectively. Four soil columns with heights of 0.3, 0.6, 1.0,1.5 meters subsequently were tested using media ratio of 3∶1. It is shown that the CRI constructed by the medium of sand/soil ratio being 4∶1 possesses better removal performance for the removal of NH3 N, NO3 N and TN. The removal rates for NH3 N and TN are 71.7% and 48.8% respectively, close to the nitrogen removal performance of unmixed purple soil. Hence the 4∶1 medium of sand/soil ratio is appropriate. It is also shown that, when considering the functional area of CRI treating the sewage, the upper 0.6 m of CRI is the main area that removes COD and NH3 N, whilst 0.6 m~1.0 m is the main area that removes TN. Increasing the soil layer thickness does not ensure better nitrogen removal performance. The 1.0 m soil layer thickness of a CRI system is appropriate for treating sewage in the Three Gorges Reservoir Region.

关 键 词:Three Gorges Reservoir Region   constructed rapid infiltration   system construction   Nitrogen removal
点击此处可从《保鲜与加工》浏览原始摘要信息
点击此处可从《保鲜与加工》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号