泥石流对重大水电工程的影响评估--以金沙江下游白鹤滩电站库区黑水河泥石流为例
引用本文:柳金峰,游勇,陈晓清.泥石流对重大水电工程的影响评估--以金沙江下游白鹤滩电站库区黑水河泥石流为例[J].水土保持通报,2012,32(3):285-289.
作者姓名:柳金峰  游勇  陈晓清
作者单位:中国科学院山地灾害与地表过程重点实验室,四川成都610041 中国科学院水利部成都山地灾害与环境研究所,四川成都610041
基金项目:国家科技支撑计划课题“堰塞湖风险评估与应急管理研究”(2009BAK56B05);国家重点基础研究发展计划专题“特大山洪泥石流防治工程设计原理与关键技术”(2011CB409903)
摘    要:泥石流是金沙江下游主要山地灾害之一,它对重大水电工程施工和运行期间的工程安全可能构成一定程度的威胁和危害。通过评估该区泥石流对重大水电工程的影响,指出泥石流对水电工程的影响主要表现在对施工道路、水电工程附属设施及移民安置、库区泥沙、坝区工程设施等4个方面。以金沙江下游白鹤滩电站库区黑水河泥石流为例,具体分析了泥石流对水电工程的影响。结果表明,黑水河泥石流可能堵塞主河,其堵塞回水和溃决洪水对白鹤滩电站建设的施工道路、临时设施有一定危害。此外,泥石流会将大量的泥砂带入库区,从而减少电站的有效库容。

关 键 词:金沙江下游  泥石流  白鹤滩电站  黑水河
收稿时间:2011/6/23 0:00:00
修稿时间:2011/9/17 0:00:00

Evaluation of the Influences of Debris Flow on Large Hydropower Projects-A Case Study on Heishui Debris flow in the Reservoir Area of Baihetan Hydropower Station
LIU Jin-feng,YOU Yong and CHEN Xiao-qing.Evaluation of the Influences of Debris Flow on Large Hydropower Projects-A Case Study on Heishui Debris flow in the Reservoir Area of Baihetan Hydropower Station[J].Bulletin of Soil and Water Conservation,2012,32(3):285-289.
Authors:LIU Jin-feng  YOU Yong and CHEN Xiao-qing
Institution:1,2(1.Key Laboratory of Mountain Surface Process and Hazards,Chinese Academy of Sciences,Chengdu 610041,China;2.Institute of Mountain Hazards and Environment,Chinese Academy of Sciences,Chengdu 610041,China)
Abstract:The lower reaches of Jinsha River are the area that has the most serious problem of mountain hazards.Debris flow is one of the main mountain hazards in the area and it may cause damages to the construction and running safety of large hydropower projects.The evaluation method for the influences of debris flow on large hydropower projects was established firstly and then four ways(construction road,ancillary facility and resettlement,sand in reservoir area and engineering facilities in the dam area) of the influences were elaborated.Heishui gully,lying in the reservoir area of Baihetan hydropower station,was taken as a typical area to evaluate the influences of debris flow on the hydropower project.Results indicate that debris flow of Heishui gully may block the main river and thus its blocked backwater and outburst flood can cause damages to construction roads and some temporary facilities.In addition,a large quantity of debris flow materials can flow into the reservoir and the storage capacity of Baihetan hydropower station decreases consequently.
Keywords:lower reaches of Jinsha River  debris flow  Baihetan hydropower station  Heishui River
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水土保持通报》浏览原始摘要信息
点击此处可从《水土保持通报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏