首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Supplemental oxygenation of electric generating station cooling water
Authors:G Fred Lee  George A Frey
Institution:1. Department of Civil Engineering, Colorado State University, 80523, Fort Collins, CO, USA
Abstract:The Delaware River Basin Commission established the requirement that the Philadelphia Electric Eddystone Generating Station shall add 5000 pounds (≈2.3 tonnes) of dissolved oxygen (DO) per day to the Delaware River as a condition for increased use of cooling water at this station. It has been found that the Eddystone Station normally adds from ≈1 to 3 tonnes per day of DO to the river arising from entrainment of air into the cooling water discharge tunnel. Further additions can readily be accomplished by bleeding air into the condenser tailpipe. The Delaware River Basin Commission's requirements can readily be met without significant expenditure of funds and without altering normal plant operating conditions.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号