首页 | 本学科首页   官方微博 | 高级检索  
     

一种4D管线模型的建立方法
引用本文:李玲,王崇倡,刘正纲. 一种4D管线模型的建立方法[J]. 安徽农业科学, 2013, 0(26): 10864-10866
作者姓名:李玲  王崇倡  刘正纲
作者单位:辽宁工程技术大学测绘与地理科学学院;
摘    要:主要研究如何在三维管线模型中引入时间信息,构建基于对象的原始信息和变化信息的映射关系,将含有时间戳的变更信息存入数据库中,建立管线时空数据模型.实现三维管线数据的动态管理,可以浏览和编辑最新的管线数据,也可以通过时间轴来查看任意历史时刻的管线数据.

关 键 词:时态GIS  三维管线  时空数据库  时空数据模型

A Method of Building Four-dimensional Pipeline Model
Affiliation:LI Ling(School of Surveying and Geography Science, Liaoning Technical University, Fuxin, Liaoning 123000)
Abstract:How to bring time information into 3D pipeline model was studied,object-based mapping relationship between original and varied information was constructed,change information including time-stamp was stored in database and pipeline spatiotemporal data model was built.The system realized dynamic management of 3D pipeline and users could look into and edit up-to-date pipeline data and browse pipeline data at any historical time.
Keywords:Temporal GIS  3D pipeline  Spatio-temporal database  Spatio-temporal model
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号