摘    要:针对三个梯级水电站出现的水量计算不平衡的现象,通过对这三个水电站的日常水情调度数据的分析和对库区河段的明渠非恒定流计算,探讨了水量计算不平衡的原因,并给出了这些水电站的水位流量关系特性,对其他流域梯级水电站有一定参考作用。

关 键 词:梯级水电站 水量平衡 水情调度 水库调度
文章编号:1007-2284(2003)10-0010-04
修稿时间:2003-03-01

Study on Water Balance of Cascade Hydropower Plant
QI E-rong ,LUO Chang. Study on Water Balance of Cascade Hydropower Plant[J]. China Rural Water and Hydropower, 2003, 0(10): 10-13
Authors:QI E-rong   LUO Chang
Affiliation:QI E-rong 1,LUO Chang 2
Abstract:Aiming at the phenomenon of water quantity unb al ance in the calculation of three cascade hydropower stations, this paper discuss es the reason of water unbalance in the calculation and gives characteristics of relation between water level and discharge by analyzing daily water condition r egulation data of these hydropower stations and calculation of unsteady flow in open channel of reservoir-area river reaches of the three stations. These resul ts give some references for other cascade hydropower stations.
Keywords:unsteady flow in open channels  reservoir regula tion  flood evolution  flood forecast  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号