首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大型油轮接卸作业风险及其控制措施
引用本文:刘金岭,张朝晖,王金鹿,李建明,张平.大型油轮接卸作业风险及其控制措施[J].油气储运,2012,31(1):57-60,85,86.
作者姓名:刘金岭  张朝晖  王金鹿  李建明  张平
作者单位:1. 中国石化管道储运公司南京输油处大榭岛油库,浙江宁波,315812
2. 中国石化集团管道储运公司南京输油处册子岛油库,浙江舟山,316000
摘    要:以册子岛30×104吨级原油码头及航道为例,通过分析原油码头水域深度、水文、气象等自然因素和大型油轮靠泊、离泊以及接卸作业等情况下的主要风险因素,提出了原油码头接卸作业安全预防措施。总结了大型原油码头在油轮接卸作业管理方面存在的主要问题,提出了监控中心、引航员、码头操作员等应采取的风险控制措施以及卸油前后船方、码头和码头操作员应执行的全方位安全管理工作。研究认为,制定可行的风险控制对策可有效降低大型油轮的作业风险,遏制重大航行和污染事故,保障原油码头接卸作业及港口航运安全。

关 键 词:册子岛  油轮  航道  接卸作业  风险要素  控制措施

Risk and control measures of oil loading and oil unloading work for large-scale oil tanker
Liu Jinling,Zhang Zhaohui,Wang Jinlu,Li Jianming,Zhang Ping.Risk and control measures of oil loading and oil unloading work for large-scale oil tanker[J].Oil & Gas Storage and Transportation,2012,31(1):57-60,85,86.
Authors:Liu Jinling  Zhang Zhaohui  Wang Jinlu  Li Jianming  Zhang Ping
Institution:1.Daxiedao Tankfarm of Nanjing Oil Transportation Company,SINOPEC Pipeline Storage & Transportation Corporation2.Cezidao Tankfarm of Nanjing Oil Transportation Company,SINOPEC Pipeline Storage & Transportation Corporation
Abstract:Taking the 300000-tonner oil tanker wharf in Cezidao and shipping lanes as an example,safety measures of oil loading and unloading are presented by means of analyzing the natural factors in water depth,hydrology and weather around the wharf,as well as the main risk factors in the berthing/unberthing and loading/unloading for the large-scale tanker.The major problems existed in the loading/unloading management for the large-scale oil tanker are summarized.It is pointed out that the monitoring center,pilots and operators should take risk control measures and overall safety management should be launched over the ship around oil unloading,the wharf and operators.It isconsidered that the risk control countermeasures presented in a research can effectively lower the oil loading/unloading risk for the large-scale tanker,keep down heavy accidents in shipping and environment to assure the safety in oil loading/unloading operation for the wharf and port.
Keywords:Cezidao  tanker  shipping lane  oil loading/unloading operation  risk factor  control measures
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号