首页 | 本学科首页   官方微博 | 高级检索  
     

The Feasible Control for the Day-operation of the Three-Gorge Cascade Hydropower Station
引用本文:Duan Yurong,Fu Li. The Feasible Control for the Day-operation of the Three-Gorge Cascade Hydropower Station[J]. 保鲜与加工, 1995, 0(1): 19-26
作者姓名:Duan Yurong  Fu Li
作者单位:Duan Yurong;Fu Li
摘    要:The feasible control problem is presented for the day-operation of the Three-Gorge Caseade Hydropower Station. The significance of the problem is explained. Basic propetties ofthe problem and the approaches to study it are discussed. Two methfods are given for solving theproblem. which are calculus of variation and linear programming. In the former. the Euler equationwith time-lag and the generalised two-point boundary conditions are obtained and the correspondingpractical implication is interpreted. In the latter. the rationality for the discrete model is exptainedand the computalional details are given for the implement software. some questions which should bepaid much attentfon and the corresponding propeels are prasented based on the numerical results andtheoretical analysis

关 键 词:Three-Gorge Cscade Hydropower Station .power system.day-operation. functional extremum.Euler equation. generalized two-point boundary conditions. Iinear program-mimg

The Feasible Control for the Day-operation of the Three-Gorge Cascade Hydropower Station
Duan Yurong,Fu Li. The Feasible Control for the Day-operation of the Three-Gorge Cascade Hydropower Station[J]. Storage & Process, 1995, 0(1): 19-26
Authors:Duan Yurong  Fu Li
Affiliation:Duan Yurong;Fu Li
Abstract:The feasible control problem is presented for the day-operation of the Three-Gorge Caseade Hydropower Station. The significance of the problem is explained. Basic propetties ofthe problem and the approaches to study it are discussed. Two methfods are given for solving theproblem. which are calculus of variation and linear programming. In the former. the Euler equationwith time-lag and the generalised two-point boundary conditions are obtained and the correspondingpractical implication is interpreted. In the latter. the rationality for the discrete model is exptainedand the computalional details are given for the implement software. some questions which should bepaid much attentfon and the corresponding propeels are prasented based on the numerical results andtheoretical analysis
Keywords:Three-Gorge Cscade Hydropower Station .power system.day-operation. functional extremum.Euler equation. generalized two-point boundary conditions. Iinear program-mimg
点击此处可从《保鲜与加工》浏览原始摘要信息
点击此处可从《保鲜与加工》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号