首页 | 本学科首页   官方微博 | 高级检索  
     

坡度较缓溢洪道上的消能方式研究
引用本文:田士豪,别大鹏,刘家明,崔金秀,石教豪. 坡度较缓溢洪道上的消能方式研究[J]. 中国农村水利水电, 2004, 0(11): 68-70
作者姓名:田士豪  别大鹏  刘家明  崔金秀  石教豪
作者单位:1. 水资源与水电工程科学国家重点实验室,武汉大学,湖北,武汉,430072
2. 湖北省水利水电勘测勘测设计院,湖北,武汉,430071
摘    要:白莲河水库第二溢洪道为二级消能,由泄槽和出水渠组成。第二级的出水渠为宽浅型渠道,底坡为0.08~0.05,坡度较一般溢洪道缓,但落差较大。出泄槽水流挑流消能后在渠道内加速,使出渠流速仍然较高。如不加以衬砌则难免受到冲刷。试验探索采用消力墩加糙方案,有效地消刹渠内水流能量,降低渠内的流速,使渠道不需要衬砌。试验表明,在坡度较缓的溢洪道上适当布置消力墩,能够有效达到消能减速的目的,是一种较好的消能方式。

关 键 词:水库  溢洪道  弯道冲击波  消力墩  渠底抬高法
文章编号:1007-2284(2004)11-0068-03
修稿时间:2004-05-01

Study on Energy Dissipation Modes of Slow Slope Spillway
TIAN Shi-hao ,BIE Da-peng ,LIU Jia-ming ,CUI Jin-xiu ,SHI Jiao-hao. Study on Energy Dissipation Modes of Slow Slope Spillway[J]. China Rural Water and Hydropower, 2004, 0(11): 68-70
Authors:TIAN Shi-hao   BIE Da-peng   LIU Jia-ming   CUI Jin-xiu   SHI Jiao-hao
Affiliation:TIAN Shi-hao 1,BIE Da-peng 2,LIU Jia-ming 2,CUI Jin-xiu 2,SHI Jiao-hao 1
Abstract:The second spillway of Bailian River Reservoir is of two-level energy dissipation, which is composed by discharge flume and outlet canal. The second level of spillway is a wide and shallow canal with a bottom slope of 0.08-0.05, which is slower than ordinary spillway, but the drop of the canal is large. The water flow in the canal speeds up after energy dissipation in the discharge flume, so the velocity of flow is still high in the canal. It is very easy to be scoured if the canal is not lined. The study is to explore the possibility of effective energy dissipation and decrease the flow speed in the canal through roughening the baffle pier, thus the canal is no need to be lined. The experiment results show that properly installing baffle piers on the slow slope spillway can reach the goal of energy dissipation and speed reducing, and it is a good way of energy dissipation.
Keywords:reservoir  spillway  bow wave at bend  baffle pier  canal bottom running up
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《中国农村水利水电》浏览原始摘要信息
点击此处可从《中国农村水利水电》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号