首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于云模型的梯级泵站系统服役状态综合评估
引用本文:徐存东,朱兴林,张锐,田俊娇,王燕,王荣荣.基于云模型的梯级泵站系统服役状态综合评估[J].排灌机械工程学报,2020,38(6):577-582.
作者姓名:徐存东  朱兴林  张锐  田俊娇  王燕  王荣荣
作者单位:华北水利水电大学水利学院,河南 郑州450046;河南省水工结构安全工程技术研究中心,河南 郑州450046;华北水利水电大学水利学院,河南 郑州450046;华北水利水电大学水利学院,河南 郑州450046;水资源高效利用与保障工程河南省系统创新中心,河南 郑州450046
基金项目:国家自然科学基金;国家自然科学基金;河南省高等学校创新团队项目;宁夏回族自治区水利科技专项
摘    要:为了准确客观地对高扬程梯级泵站系统服役状态进行定量化评估,以宁夏盐环定高扬程梯级泵站系统为研究对象,通过云理论模型定量化模糊性因素,同时基于云模型数字特征对指标状态进行定量化描述,并构建泵站系统服役状态评估指标体系,构建了评语层标准云模型、要素层隶属度云模型,同时采用排队理论求解指标权重,进而实现泵站系统服役状态的综合评估.结果表明:泵站系统更新改造前与更新改造后2种工况下服役状态综合评价云分别是Cb(0.6264,0.0614,0.0168),Ca(0.8421,0.1005,0.0126),改造前其服役状态处于“较好(V4)”等级,改造后服役状态处于“好(V5)”等级,验证评估结果符合实际情况.采用该方法可为梯级泵站系统服役状态评估或类似系统的预测提供有益参考.

关 键 词:梯级泵站  云模型  服役状态  综合评估  隶属度
收稿时间:2019-04-15

Comprehensive evaluation of service status of cascade pumping station based on cloud model
XU Cundong,ZHU Xinglin,ZHANG Rui,Tian Junjiao,Wang Yan,WANG Rongrong.Comprehensive evaluation of service status of cascade pumping station based on cloud model[J].Journal of Drainage and Irrigation Machinery Engineering,2020,38(6):577-582.
Authors:XU Cundong  ZHU Xinglin  ZHANG Rui  Tian Junjiao  Wang Yan  WANG Rongrong
Institution:1. School of Water Conservancy, North China University of Water Resources and Electric Power, Zhengzhou, He′nan 450046, China; 2. He′nan Provincial Hydraulic Structure Safety Engineering Research Center, Zhengzhou, He′nan 450046, China; 3. Collaborative Innovation Center of Water Resources Efficiency and Protection Engineering, Zhengzhou, He′nan 450046, China
Abstract:In order to accurately and objectively quantify the service status of the high-lift cascade pumping station system, the Ningxia Yanhuan fixed-height cascade pumping station system was taken as the research object. The ambiguity factors were quantified through the cloud theoretical model and the indicator state was quantitatively described based on the cloud model digital characteristics was quantitativelg described, and an index system for evaluating the service status of the pumping station. The standard cloud model of the comment layer and the cloud model of the membership level of the element layer were constructed. At the same time, the queuing theory was used to solve the index weights, and the comprehensive evaluation of the service status of the pumping station system was rea-lized. The results show that the comprehensive evaluation clouds of the service status of the pumping station system before and after renovation are Cb(0.626 4, 0.061 4, 0.016 8)and Ca(0.842 1, 0.100 5, 0.012 6). In the ″good(V4)″ state, the service status level after the transformation is in the ″good(V5)″ state, verifying that the evaluation results are in line with the actual situation. It can be seen that this method can provide a useful reference for the evaluation of the service status of the cascade pumping station system or the prediction of similar systems.
Keywords:high-lift step pumping station  cloud model  service status  membership  comprehensive evaluation  
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《排灌机械工程学报》浏览原始摘要信息
点击此处可从《排灌机械工程学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号