首页 | 本学科首页   官方微博 | 高级检索  
     检索      

MODEL TEST RESEARCH ON A COMPOSITE LINING OF UNDERGROUND ENGINEERING IN JOINTED ROCK
作者姓名:Zhu  Jinmin  Wang  Liwei
作者单位:Department of Civil Engineering
摘    要:Combined with thedesign precept of Cai-Yuan highway tunnel 2 in Chongqing,stress state,time ffectiveness and rupture mechanism of rock near the bounda-ries of the tunnel and the second lining in jointed rock mass arc studied with model tests.The results show that shotcretc-bolt support betters mechanical properties of the periphey rock of the tunnel,and increases the capacity of anti-deformation.The second lining also has the action of supporting structure.

关 键 词:composite  lining  tunnel  shotcrete-bolt  rock  mechanics  

MODEL TEST RESEARCH ON A COMPOSITE LINING OF UNDERGROUND ENGINEERING IN JOINTED ROCK
Zhu Jinmin Wang Liwei.MODEL TEST RESEARCH ON A COMPOSITE LINING OF UNDERGROUND ENGINEERING IN JOINTED ROCK[J].Storage & Process,1991(1).
Authors:Zhu Jinmin Wang Liwei
Institution:Department of Civil Engineering
Abstract:Combined with thedesign precept of Cai-Yuan highway tunnel 2 in Chongqing,stress state,time ffectiveness and rupture mechanism of rock near the bounda-ries of the tunnel and the second lining in jointed rock mass arc studied with model tests.The results show that shotcretc-bolt support betters mechanical properties of the periphey rock of the tunnel,and increases the capacity of anti-deformation.The second lining also has the action of supporting structure.
Keywords:composite lining  tunnel  shotcrete-bolt  rock mechanics  
点击此处可从《保鲜与加工》浏览原始摘要信息
点击此处可从《保鲜与加工》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号