首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于典型年法的海绵城市建设控制指标研究
引用本文:潘笑文,徐得潜.基于典型年法的海绵城市建设控制指标研究[J].水土保持通报,2017,37(1):123-127,131.
作者姓名:潘笑文  徐得潜
作者单位:合肥工业大学 土木与水利工程学院,安徽 合肥,230009
基金项目:中央高校基本科研业务费专项资金资助“城市内涝风险评估与雨水排水系统优化设计研究” (21920150505)
摘    要:目的]探讨海绵城市控制指标年径流总量控制率的确定方法,为海绵城市建设控制指标的合理确定提供新的思路。方法]结合中国目前海绵城市建设相关规范及研究成果,分析关于年径流总量控制目标确定方法的合理性。以合肥市为例,分别采用长序列法、典型年法、外排径流系数法、逐日水量平衡法对相关问题进行研究,探讨不同年径流总量控制率对外排径流系数的影响及不同规模雨水调蓄设施的实际控制效果。结果]提出控制指标的典型年计算法,并总结了外排径流系数随年径流总量控制率变大不能无限减小的规律,提出采用雨水利用有效容积这一指标来校核年径流总量控制率提高的适宜范围。结论]典型年计算方法与雨水系统设计重现期相对应。结合对实际雨水总量控制率的研究,可为海绵城市建设中径流总量控制目标的确定提供新的思路。

关 键 词:海绵城市  年径流总量控制率  典型年法  长序列法
收稿时间:2016/5/29 0:00:00
修稿时间:2016/6/23 0:00:00

Research on Control Index in Sponge City Construction Using Typical Hydrological Year Method
PAN Xiaowen and XU Deqian.Research on Control Index in Sponge City Construction Using Typical Hydrological Year Method[J].Bulletin of Soil and Water Conservation,2017,37(1):123-127,131.
Authors:PAN Xiaowen and XU Deqian
Institution:College of Civil and Hydraulic Engineering, Hefei University of Technology, Hefei, Anhui 230009, China and College of Civil and Hydraulic Engineering, Hefei University of Technology, Hefei, Anhui 230009, China
Abstract:Objective] The determination method for total annual runoff volume is investigated in order to provide a new idea for the determination of control index of sponge city construction. Methods] Combining with the relevant standards and research achievements in the construction of sponge city in China, the rationality about the method to determine the total annual runoff volume control at present are analyzed. Hefei City was taken as an case to discuss relevant problems using typical hydrological year method, long-term runoff serials method, runoff coefficient method and daily water balance method. The effect of variation of runoff control rate on control targets and the actual rainfall control of rainwater storage facilities in different scales were explored. Results] This paper proposes a typical hydrological year method, and finds that the runoff control rate cannot be unlimitedly reduced with the rise of total annual runoff volume control target. The effective volume of rainwater utilization can be used to check the suitable range of total annual runoff control. Conclusion] The typical hydrological year method, combining well with the design return period of rainwater system and its application in studing actual rain volume control, provides a new idea for the determination of runoff volume control in sponge city construction.
Keywords:sponge city  total runoff volume control  typical hydrological year method  long-term runoff serials method
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水土保持通报》浏览原始摘要信息
点击此处可从《水土保持通报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号