首页 | 本学科首页   官方微博 | 高级检索  
     

水土保持生态环境建设项目"捆绑"需要解决的问题
引用本文:向修明. 水土保持生态环境建设项目"捆绑"需要解决的问题[J]. 中国水土保持科学, 2008, 6(Z1): 105-106
作者姓名:向修明
作者单位:四川省宜宾市水利局,644000,四川宜宾
摘    要:水土保持生态环境建设涉及部门多,如何整合项目、发挥国家补助资金的最大效益,宜宾市水利部门进行了积极探索,并在实践中取得了明显成效.但总体来说,整合力度还不够.针对存在的问题,提出了相应的对策.

关 键 词:水保工程  项目捆绑  措施  四川

Some issues about project binding in ecological environment construction for soil and water conservation
Xiang Xiuming. Some issues about project binding in ecological environment construction for soil and water conservation[J]. Science of Soil and Water Conservation, 2008, 6(Z1): 105-106
Authors:Xiang Xiuming
Affiliation:Xiang Xiuming(Water Conservancy Bureau of Yibin,644000,Yibin,Sichuan,China)
Abstract:The ecological environment construction is related with a lot of departments.The departments of water conservancy in Yibin have studied the project binding to realize maximum benefits of the fund from the Central government.Though remarkable results have been achieved in the work,project binding still has a lot of work to do.Some suggestions have been proposed in the paper to solve the existing problems.
Keywords:soil and water conservation  project binding  measure  Sichuan  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号