首页 | 本学科首页   官方微博 | 高级检索  
     

郑东新区龙子湖供水井群优化研究
引用本文:李志萍,陈肖刚,何冰,董贵明,李德盈. 郑东新区龙子湖供水井群优化研究[J]. 灌溉排水学报, 2007, 26(2): 60-64
作者姓名:李志萍  陈肖刚  何冰  董贵明  李德盈
作者单位:华北水利水电学院,资源与环境学院,河南,郑州,450008;黄河勘测规划设计有限公司,河南,郑州,450003;河海大学,水资源环境学院,江苏,南京,210098
基金项目:国家高技术研究发展计划(863计划) , 华北水电学院青年基金
摘    要:采用Aqua3D有限元软件对郑东新区龙子湖地下水开采进行了井群优化研究。开采工况1没有考虑雨水利用,开采地下水仅满足湖水景观用水,14口井均匀开采,地下水开采量为274×104m3/a,无降落漏斗出现,水位降深较小(1~2 m),可能会导致湖体周边土地盐渍化现象产生;开采工况2既要供给高校用水,又不利用雨水资源,20口井均匀开采,地下水开采量为1049×104m3/a,漏斗中心出现在湖体外侧北部,最大降深8.5 m,会影响到邻近水源地的正常运行;开采工况3地下水开采量为593×104m3/a,其中方案1为14口井均匀开采,方案2(14口井)和方案3(12口井)为非均匀开采,3个方案漏斗中心均出现在湖体东侧,漏斗中心最大降深依次为4.6、4.3和4.2 m。工况3既考虑了雨水利用,又考虑了龙子湖工程与高校杂用水供水系统联合运行,为一个高效供水方案,其中方案3水位下降最小为推荐方案。

关 键 词:Aqua3D  井群优化  龙子湖
文章编号:1000-646X(2007)02-0060-05
修稿时间:2006-07-03

Research on Optimization of Wells in Longzi Lake in Zhengdong Area
LI Zhi-ping,CHEN Xiao-gang,HE Bing,DONG Gui-ming,LI De-ying. Research on Optimization of Wells in Longzi Lake in Zhengdong Area[J]. Journal of Irrigation and Drainage, 2007, 26(2): 60-64
Authors:LI Zhi-ping  CHEN Xiao-gang  HE Bing  DONG Gui-ming  LI De-ying
Affiliation:1. College of Resources and Environment, North China Institute of Water Conservancy and Hydroelectric Power, Zhengzhou 450008, China; 2. Huanghe Limited Corporation of Survey, Program and Design, Zhengzhou 450003, China; 3. College of Water Resources and Environment, Hohai University, Nanjing 210098, China
Abstract:Groundwater will lately be exploited to supply for Longzi Lake in Zhengdong area.In this paper Aqua3D definite element software is used for research on wells optimization.In mode 1: rainwater is not considered,and groundwater is exploited only for lake;the total yield of 14 wells is 274×104 m3/a,and that of every well is equal;water level drawdown is little(only 1~2 m) without cone of depression,and this would lead to soil salinization.In mode 2: rainwater is not used,and groundwater is exploited not only for lake but also for colleges;the total yield of 20 wells is 1049×104 m3/a,and that of every well is equal;the biggest water level drawdown is 8.5 m with a cone of depression on the north of lake,and this would influence the adjacent work.In mode 3: the total yield is 593×104 m3/a;there are 3 plans including even exploitation of 14 wells in plan 1 and uneven exploitation of 14 wells in plan 2 and 12 wells in plan 3;the biggest water level drawdown of three plans are 4.6、4.3 and 4.2 m with a cone of depression on the east of lake in each plan.Mode 3 is a efficient water supply mode because of rainwater usage and combined water supply between Longzi Lake and colleges,and plan 3 is considered best due to its least drawdown.
Keywords:Aqua3D  optimization of wells  Longzi Lake
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号