Manufacturing resource modeling of complexassembly process under project-based manufacturing |
| |
Authors: | GUO Gang XU Jian-ping LUO Yu |
| |
Affiliation: | College of Mechanical Engineering, Chongqing University, Chongqing 400044,P.R. China;College of Mechanical Engineering, Chongqing University, Chongqing 400044,P.R. China;School of Management, Guizhou University, Guiyang 550025, Guizhou,P.R. China;College of Mechanical Engineering, Chongqing University, Chongqing 400044,P.R. China;School of Electronic &Information Engineering , Chongqing University of Science and Technology, Chongqing 400050, P.R. China |
| |
Abstract: | In an engineering-to-order (ETO) company, organization and management of manufacturing process is differ from common products because of the complexity of product. A project-based manufacturing (PM) planning model for product final assembly is proposed based on single-piece and small-batch production model so that the characteristics of complexity, specificity and high complex product manufacturing process can be met by means of projected-based manufacturing. The method of layered network planning under project-based manufacturing can transform the objects of planning from parts to assembly cell in the course of final assembly that has some time-based buffer for planning; simultaneously a resource-task matrix is build for the whole assembly process. The matrix can achieve the relatedness between manufacturing resources and assembly task, and follow the resources loads in order to realize the matching of planning and resource against project product. |
| |
Keywords: | |
|
| 点击此处可从《保鲜与加工》浏览原始摘要信息 |
|
点击此处可从《保鲜与加工》下载全文 |
|