摘    要:宁夏水利厅东干渠山水沟渡槽翻建工程于2008年9月开工建设,2009年4月完工。渡槽槽身采用预应力结构,两侧墙吊装就位后再进行槽底混凝土浇筑,原设计方案采用满堂脚手架作底部支撑,项目部根据现场施工情况改进施工措施,改用悬挂支撑,达到预期效果,节省了施工成本。

关 键 词:山水沟渡槽  悬挂支撑  施工工艺

The main East Mountain Drain Aqueduct Rebuilding Project Suspension Support Construction Technology Research
Zhang Yongde.The main East Mountain Drain Aqueduct Rebuilding Project Suspension Support Construction Technology Research[J].Beijing Agriculture,2012(33):162.
Authors:Zhang Yongde
Institution:Zhang Yongde
Abstract:Ningxia provincial water resources bureau east main canal mountain drain aqueduct rebuilding project in September 2008 to startconstruction, completed in April 2009. Aqueduct body using prestressed structure, two side wall hoisting in place of the reentry after tank bottomconcrete pouring, the original design scheme adopts the scaffold for bottom support, the project construction according to the improved constructionmeasures, convert suspension support, and achieved the desired results, save the construction cost.
Keywords:mountain drain aqueduct  suspension support  construction technology