首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
The unbalanced nature of 35 kV distribution system due to capacity values is difficult in neutral operation, which can not meet the demand of voltage balance in static state and arc distinct in fault. This paper proposes a new neutral operation as neutral insulation in static state and resonance grounding in fault , along with EMTP simulation acts. Simulation indicates that new neutral operation method can improve lightning withstand level and decrease trip-out rate of grids.  相似文献   

2.
The aufhors calculate and analyze the arcing grounding overvoltage of 10 kV power network in case of neutral ungrounded and grounding through nonlinear resistance using EMTP, with a actual 10 kV power network of a substation in Guizhou province as an example. The emulational calculation results show that the grounding method which grounds through nonlinear resisitance has the advantages of the other two methods, can better limit the arcing grounding overvoltage and can not stop the power supply .even one phase is grounded by fault, so it can ensure the security of the power networkg supply . the network neutral grounding through nonlinear resistance needs more deep study and analysis as a new network neutral grounding mehtod.  相似文献   

3.
The paper presents a novel continuously adjustable Peterson coil. If it is used in the system of neutral point grounding through Peterson coil, not only the high price can be reduced and the complicated problems can be solved of which the high voltage inductance controlling systems, but also advantages of the system of neutral point grounding though Peterson coil can be shown. It is introduces that how adopts low voltage thyristors for continuing adjusting inductance of the Peterson coil of which the voltage level ranges from 6 kV to 66 kV. This paper discusses the formula of calculating the inductance variable ranges and the harmonic currents which presents stable harmonic current under the phase controlled mode also. The theory of the designing coil is verified by the Saber simulation and practicality experiment.  相似文献   

4.
The winding hot-spot temperature is one of the most critical parameters that determines the power transformer overloading capability and the aging rate of the oil-paper insulation. Based on the traditional thermal theory, the paper proposes a simulation model to predict transformer winding hot spot temperature taking into account oil viscosity changes with temperature, and combined with the thermal-electric analogy method and hot spot temperature rise model recommended by IEEE. The Runge-Kutta method is used to calculate top-oil temperature and winding hot-spot temperature of the transformer, and then compare them with the measured data obtained from the 100 kVA/5 kV (ONAN) experimental transformer. The simulation results are in good agreement with experimental data.  相似文献   

5.
Research on Lightning Intruded Wave for 500 kV Substations   总被引:1,自引:0,他引:1  
The study on overvoltage for 500 kV substation caused by lightning intruded wave is presented. In this paper, we calculate by using electromagnetic transient program (EMTP) and combine substation with incoming lines ,so some influence factors can be considered such as impulse voltage second characteristic of insulator strings, lightning stroke point on the incoming lines and impulse grounding resistance of towers. The results show that the method is close to the practice and some factors of incoming lines are important to overvoltage.  相似文献   

6.
Grounding grids are the guarantee of substation running safety. The fault of grounding grids is a threat to people and equipment in substations. A method to diagnose the fault of grounding grids based on magnetic field inverse problem. The inverse problem of magnetic field is established by injecting and extracting a low frequency current. The morbid of inverse problem is solved through regularization and Newton iteration method to obtain the distribution of the mesh currents. The approximate distribution of the magnetic field is calculated to diagnose the fault of the grounding grid. A 4×4 substation grounding grids is taken as an example. By comparison of the forward problem result, the error is under 3%, so the prposed method of inverse problem is verified. The selection of measurement point is discussed, and 40% of the number of meshes is accounted to approximate the real distribution of the magnetic field on the grounding grids.  相似文献   

7.
The paper studies the theory about the corrosion as well as the broken point of the grounding grid in power plants and substations. By using sensitivity analysis, failure diagnosis equation is put up through rigorous theoretical analysis. Meanwhile the problem of morbid equation is solved by introducing lowest energy theory and technique of optimiation to diagnosis equation solution of grounding grid combined with definite constraint condition and linear or non-linear objective function, the fault diagnosis equation is discussed. The results of emulation calculation and analogous experiments verify the correctness,feasibility and practicality of the theory and method.  相似文献   

8.
冯鹤 《中国农学通报》2016,32(17):172-175
为了提高人员生命损失风险计算的针对性、准确性,为人工接地装置安全布设提出建设性的指导意见,通过对人工接地装置泄流时接触电压、跨步电压的计算方法的分析,确定了人工接地体泄流时接触电压、跨步电压导致人身伤亡的损害概率的定量计算方法。计算时,通过对接触电压、跨步电压计算值与人体耐受接触电压、跨步电压阈值的比较分析,确定能达到该阈值的最小雷电流幅值,再通过对项目所在位置雷电活动特征的分析,确定可能超过灾害阈值对应的雷电流幅值,即可能产生风险的雷电流所占的频率,认为该频率即为接触电压、跨步电压导致生物伤害的损害概率。对人工接地装置接触电压、跨步电压的计算以垂直接地极为例,同时考虑了冲击电流较工频电流对计算方法的影响。  相似文献   

9.
The paper presents an on-line algorithm for predicting the average temperature of power transformer winding according to its load current. The algorithm has accounted for the whole history of load current and variations of ambient temperature. The overload capabilities of transformer can be increased by monitoring and controlling the winding temperature and the necessary durability of the transformer can be ensured. The algorithm can also forecast the future winding temperature and the time of reaching the max, permitted the assumed future load current and oil temperature.  相似文献   

10.
In order to find the most appropriate connection mode of 10 kV distribution network, a new approach is put forward ,in which the comprehensive weight method is applied to power system planning. At first, the main kinds of connection mode of 10 kV distribution network are introduced,then,basing on the information of subjective weights and objective weights, the performing process of the new approach is presented. It can choose the most appropriate connection mode of 10 kV distribution network sufficiently and can be calculated easily. At last, the validity and practicability of this new approach is testified with a sample.  相似文献   

11.
This paper centers on the study of intelligentized fault lineselection when the small current grounding electric system is grounded in single-phase. Based on the known theories and methods of groundingline-selection, we propose a comprehensive neural-based intelligentized processing plan, which offers a new approach to improving accuracy rate of fault line selection andevaluating various arithmeticfor grounding protection in practice.  相似文献   

12.
With theoretic analysis, lab experiment and engineering application, it is indicated that the SZJ grounding system is a new type grounding system which distinctly reduces the grounding impedance of grounding grids, especially of grounding grids in the zones with high-resistivity or grounding grids with scanty area. The design and calculation method for application of SZJ grounding system is also studied.  相似文献   

13.
The winding hot spot temperature of the oil immersed power transformer is an important parameter. It has a great influence on the transformer insulation aging and a close relationship with the transformer top oil temperature. The changes of non linear thermal resistance, open circuit impedance, and oil viscosity and winding losses with temperature are also taken into account. An improved model added on the transformer top oil temperature to calculate transformer winding hot spot temperature by using the viscosity and loss correction factors is proposed. Model parameters are estimated by Levenberg Marquardt method. In the end, by comparing with the measured data tested under different conditions, the model shows good consistency under underload (90%), rated load (100%) and overload (110%) conditions respectively, and describes the temperature variation more accurately in the dynamic loading profiles.  相似文献   

14.
15.
In order to resolve the hazard of biofouling and scale in circulating cooling water system of power stations, this paper takes the lead in combining high voltage pulses and high frequency pulses for sterilization and descaling process. It analyzes both electromagnetic effects and biochemical effects on sterilizing and descaling process caused by the high voltage pulses and high frequency pulses respectively. The pulse generator is designed according to the requirements of electromagnetic parameters for effective operation. The design and improvement of process chambers are assisted by electromagnetic field simulation technology. Experimental data prove that the system can output high voltage pulse whose maximum peak value reaches 7 kV and high frequency pulse whose maximum peak value reaches 100 V the frequency ranges from 500 kHz to 2 MHz. The rate of sterilization can be as high as 91,and the rate of descaling reaches 71. This system is expected to achieve the standards of industrial water treatment through further research.  相似文献   

16.
Based on the reactive surplus of Chongqing 220 kV main electric power network under low water and low load, and on state of higher system voltage, a thorough research is done on voltage and reactive power of the system power network by means of calculation,analysis and experiments. A main network calculating equivalence model of power network in Chongqing is constructed. And reactive power optimizing calculation is figured out on the Chongqing power network on condition that the loss minimum of the active power network is object function. Several optimizing compensatory schemes are put forward. Based on the calculation result and the analysis of all schemes, the most reasonable and feasible optimizing scheme could be achieved. Meanwhile, the feasibility that the system voltage could be adjusted when generator operating under excitation was demonstrated. According to the experience of under-excitation operation of the same type units , it decreases the system voltage, improves Chongqing power network running performance, and strengthens the coordination and stabilization of system.  相似文献   

17.
Erosion Optimized Diagnosis of Brand Grounding Grid   总被引:1,自引:0,他引:1  
To find the corrosion of the grid ,large area cutting has been adopting in practice for a very long time. But this method is blind, difficult and influences the system operating. The erosion diagnosis method in the past is effective for the smaller grid. To the brand ones, it can not take effect. The method of separating the grounding grid into several parts and diagnosing step by step is discussed by lots of simulation about middle or brand grounding grid erosion diagnosis. This method makes the brand grounding grid erosion diagnosis quick and truly without power cut and digging large area, satisfies the demand in practice. Putting this optimized diagnosis method into practice , the result is good.  相似文献   

18.
励磁绕组匝间短路是同步发电机常见故障之一。为保证机组和电网的安全可靠运行,有必要对该故障进行在线分析检测。首先介绍了应用于同步发电机励磁绕组匝间短路故障在线分析的磁场-电流谐波分析法、探测线圈法、多回路法、输出电气量分析法、振动分析法等的研究现状,并对几种方法进行了比较,然后对未来在线分析方法的发展方向进行了展望,对输出电气量分析法提出了两条研究思路,最后说明了在线分析方法应具有实际可行性和多用途性。  相似文献   

19.
基于LabVIEW的潜油电泵数据采集系统   总被引:1,自引:0,他引:1  
应用LabVIEW虚拟仪器现场可编程门阵列(FPGA)对潜油电泵的电压、电流参量进行实时数据采集,通过上位机对采样数据进行分析处理,得到潜油电泵的视在功率、有功功率、无功功率和功率因数,并与电能质量检测仪检测数据进行对照。系统硬件采用NI sbRIO-9606和NI9683夹层板配合使用,突破了传统的依靠DAQ助手的硬件采集,基于现场可编程门阵列(FPGA)的数据采集系统,由软件构成采集功能芯片,可控性强,准确性高,应用性好。实验表明,该系统在误差允许范围内能够对数据进行准确采集。  相似文献   

20.
With the increasement of the harmonic quantity in power system ,single phase harmonic power flow calculation can't meet the needs. This paper discusses the components model in detail under harmonic condition in three phase distribution power system, include generator,transformer,line and load. Particularly, the transformer model considers the winding connection, the phase shifting among primary and secondary windings, and the off-normal tapping.The three-phase model of transformer, used in traditional harmonic power flow, may the preuent the model from converging, so the paper proposes a three phase back forward sweep harmonic load flow algorithm based on phase-components. At last, a test example was used to prove the algorithm. The results indicate that the proposed method is efficient.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号