首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 781 毫秒
1.
According to the characteristics of interfacial stress between surrounding rock and shotcrete support, mechanical model of composite curved beame for support system of tunnel surrounding rock and shotcrete lining was established, considering the interfacial deformation coordination and the effects of bearing arch of surrounding rock. Then from static equilibrium of two differential elements, the differential equations for the radial displacement of composite curved beam were obtained. All analytic formulas of both interfacial stress and internal forces between surrounding rock and shotcrete lining by arbitrary distribution load were derived. And thus the mechanical condition of interface zone and the stress concentration position were obtained, which is convenient to assess the stability of surrounding rock and predict the safety. Finally, the analysis of tunnel project excavated by bench method showed that shotcrete lining made the formation of compressive stress zone in surrounding rock by transferring stress from the interface between surrounding rock and shotcrete, which is beneficial to improve the stability of surrounding rock.  相似文献   

2.
Rock is a kind of physical nonlinear complicated medium, under deep buried condition the surrounding rock system deformation shows geometrical nonlinear characteristic, and the interaction between the two nonlinear mechanism makes the unloading of surrounding rock system evolving complexly. Based on the Lagrangian method and large deformation caculation method, both the double nonlinearity and nonlinear dynamics character of deep buried tunnel surrounding rock system under unloading are studied. The numerical model results show that the Kolmogorov entropy has been extracted from the evolution data in the unloading process of surrounding rock system. The analysis indicates that the typical chaos character has been demonstrated in the process of unloading for deep buried tunnel surrounding system and the rock mass energy dissipation is analyzed at the stage of unloading.  相似文献   

3.
The construction process of anchor,fiber concrete and its mechanical principle of interaction with surrounding rocks is studied by field tests from the view of researching stability of single layer tunneling lining. The mechanical properties of single layer lining in the practical application of tunnel engineering are measured. On the basis of this study,the mechanism of single layer tunnel lining is discussed,which is finally applied to the engineering practice,formatting a set of theoretical support for the design method of single layer lining. Studies found that close effect between fiber reinforced concrete and rock is well,which shows that the single layer lining design method to ensure quality and safety proposed in this paper is feasible,and construction characteristic of retaining structure is reliable. The method can be widely applied in engineering practice,and has remarkable economic benefit and social benefit.  相似文献   

4.
Creep characters of tunnel supports structure is analyzed according to triaxial creep test of concrete specimen of deep tunnel supports structure adopting MTS815 hydraulic servo system. The creep parameters of nonlinear creep model are presented based oncreep curve. The finite element numerical model has been established considering tunnel construction process, creep characters of surrounding rock and support structure. The displacement characteristics, the effective stress and the maximum shear stress in different position in primary support and second lining are obtained through creep characters analysis of surrounding rock and supports structure. The features of displacement and stress dependent time of tunnel supports has visible difference comparing with discard creep effect and calculation displacement and practical monitoring results is basic concordance. The creep characters of surrounding rock and tunnel supports should be considered for deep tunnel.  相似文献   

5.
Based on dynamic time history analysis, dynamic response behavior of an un supported tunnel through fault zone which was simulated by interface and solid elements was studied under uniform input earthquake wave excitation. The analyses of response behaviors, including displacement difference, acceleration magnification, and plastic zones and so on, were carried out when earthquake wave excitation was input along transverse, longitudinal and vertical of tunnel respectively. The results show that simulation method for fault zone is effective; the earthquake causes obvious displacement difference at fault zone and surrounding rock contacting part. The maximal displacement difference reaches to 51.8mm under transverse uniform input earthquake wave excitation. And the displacement difference under vertical and longitudinal is only 44.3% and 23.1% of the transverse value, respectively; the acceleration magnification in fault zone is significantly greater than that in surrounding rock. Shear failure zone appears at the fault zone and surrounding rock contacting part, and it is especially prominent under input longitudinal earthquake wave excitation. It is proposed that fault zone has significantly influence on the dynamic performance of tunnel. The fault zone and the transitional zones are the control zones of seismic design when tunnel passes through fault zone, thus, the study on the anti seismic measures should be further strengthened.  相似文献   

6.
Combined with thedesign precept of Cai-Yuan highway tunnel 2 in Chongqing,stress state,time ffectiveness and rupture mechanism of rock near the bounda-ries of the tunnel and the second lining in jointed rock mass arc studied with model tests.The results show that shotcretc-bolt support betters mechanical properties of the periphey rock of the tunnel,and increases the capacity of anti-deformation.The second lining also has the action of supporting structure.  相似文献   

7.
In process of the tunnel construction throw New Austrian Tunnelling Method, the result of smoothwall blasting to rock tunnel is not good, there are more and more cavities produced behind the lining. On the basis of engineering project, this paper makes the three-dimensional elastic-plastic analysis throw numerical simulation, discusses the stress-strain behavior of primary support when there is a different size of rectangle cavity behind the lining. In addition the safety factor of tunnel is calculated with cavity based on the strength reduction finit element method. This factor is compared with the factor of health tunnel. The stability of tunnel structure system is estimated through the linear regression analysis between stress of lining and safety factor.  相似文献   

8.
When tunnels are through water bearing section of fractured rock mass, a complex interaction process between rock mass deformation and fluid transportation is one of the most important reasons for water gushing, water bursting and mud bursting.To study the rock mass deformation and fluid transportation in tunnel excavation under complex geological conditions, a hydraulic model of complex crack rock mass was established from the relationship between the crack growth degree of surrounding rock in deep buried tunnel and the engineering scale, with which fracture network of different levels in rock mass could be considered simultaneously.Furthermore,a computer Fortran program was put forward to simulate the solid fluid coupling of excavation process of a deep buried tunnel.And it was found that the principal fractures had strong flowing action and network fractures had storage function and lag effect in seepage area.And the yield area of surrounding rock was increased under the coupling of seepage field and stress field.  相似文献   

9.
Based on the elastic theory, an analysis can be made on stress and plastic deformation under tunnel excavation and shotcrete support.FLAC 3D can be used to simulate the mechanical behavior of excavation and support, getting the deformation of surrounding rock stress and plastic without support and shotcrete. The results show that, the prestress applied on the anchor equals to the supporting force when the tunnel plastic zone disappears. This support improves the self bearing capacity of surrounding rock, effectively suppresses the expansion of the plastic zone after the tunnel excavation, and prevents further damage to the tunnel surrounding rock.  相似文献   

10.
In this paper,the ring shell lining with annularly verticalwalls made contact with the surrounding rock is considered as a combinationstructure formed of ring shell,inner and outer annular barrels on elastic fo-undation.The complex equation and its solutions of ring shell under deadload of lining and vertical and horizontal surrounding rock pressures are de-rived by the method of complex function.The governing equation and itssolution of the barrels on elastic foundation are also derived by theory ofcylindrical shell.And then,the ring shell lining is assembled by the subst-ructures by means of compatibility conditions of internal forces and defor-mations between them.In the paper,all formulas for the practical computa-tion in engineering are derived,the numerical examples are given and theeffects of the parameters of the lining on the work behaviours of lining alsoare discussed preliminarily  相似文献   

11.
This paper uses the Mohr-Coulomb criterion with tension cut-off strain-softening model and the large-strain calculation method to study the localized deformation and progressive failure.It investigates the process of stain localization appearing,growing and sample failure,and uses the physical and numerical simulation to explore the relationship between strain localization and progressive failure of surrounding rock.The results show that the soften character of rock sample is caused by stain localization.The breach point of progressive failure is founded based on the distribution law of plastic zones and soften strips.The key causes of the tunnel convergence deformation after opening are the plastic extrusion and the elastic deformation of rock yield units caused by stress release.  相似文献   

12.
页岩烧结保温砌块砌体基本力学性能试验研究   总被引:1,自引:0,他引:1  
通过对页岩烧结保温砌块砌体轴心抗压、沿通缝抗剪、剪压复合抗剪性能试验研究,分析其破坏特征和破坏机理。试验结果表明:页岩烧结保温砌块砌体受压破坏时,在竖向灰缝附近形成主裂缝,接近极限荷载时砌体出现表皮剥落现象;沿通缝抗剪破坏模式主要为单剪破坏,脆性明显;剪压破坏有剪磨、剪压和斜压3种类型;实测轴心抗压强度平均值高于规范值,沿通缝抗剪强度、复合抗剪强度平均值低于计算值,并分别给出砌体轴心抗压强度平均值、抗剪、剪压复合受力抗剪强度平均值建议公式;剪压复合抗剪强度随着压应力的增大而增大;建立了页岩烧结保温砌块砌体受压应力应变关系表达式;给出该类砌块的弹性模量和泊松比的建议值。  相似文献   

13.
Deformation monitoring and control measures of a shallow buried large span tunnel constructed using the pile beam arch (PBA) method are described, taking the North Gongti Road Station of Beijing Metro line 10 as an example. Based on the monitoring datum, the crown settlement, convergence, ground settlement of the tunnel and the bridge foundation settlement are analyzed. The results show that (1) the PBA tunneling method can restrain the ground settlement and deformation of a shallow buried large span tunnel; (2) the depth, tunnel span and pilot tunnel construction may influence the deformation of a shallow buried large section tunnel significantly; and, (3) advanced conduit grouting, timely preliminary support and permanent lining construction can reduce the deformation effectively.  相似文献   

14.
Through the statistical analysis of analyzed the particularity of karst surrounding rock classification, finally obtained the rock classification index system of south karst highway tunnel construction based on rock strength, rock complete coefficient ,groundwater state, structural plane state the structural plane strike to tunnel influence, karst development to tunnel influence. And the model is applied to tianshengqiao tunnel and guanshang 2 tunnel with the example verification, and compared with the classification results and experts judgment to get the accuracy is 93.3%.  相似文献   

15.
For the super-large section tunnel due to its super large span and flatness,together with the effect of various processes and excitation of surrounding rock during construction,the mechanical behavior of super-large section tunnel is quite complicated.Making use of the "CTSSSRH",the physical analogue for simulating the construction dynamic process of super-large section tunnel in different construction methods is experimented.The rule of surrounding rock displacement and strain development is studied and the reasonable construction method is put forward.  相似文献   

16.
The response properties of displacement and stress of tunnel support structure are discussed in detail under the action of horizontal earthquake acceleration(Ya),longitudinal earthquake acceleration(Za) and horizontal-longitudinal earthquake acceleration(YZa).This discussion is based on an analysis of the surrounding rock-support structure-earthquake interaction,adoption of an ADINA nonlinear finite element and construction mechanics,and transient dynamic time domain analysis of a large cross section tunnel.Results of analysis show that:(1) Horizontal earthquake acceleration has important influence on horizontal displacement,maximum principal stress,acceleration and velocity.(2) Longitudinal earthquake acceleration has important influence on longitudinal displacement,effective stress,maximum and minimum principal stress,maximum shear stress,acceleration and velocity.(3) When Ya=0.191g and 0.440g or Za=0.141g and their combined action,the initial support of tunnel would be damaged and the local lining would have partial damage.(4) When Ya=0.440g or Za=0.326g and their combined action,the lining of tunnel would be damaged.(5) When Ya=0.880g or l Za=0.652g,the support structure of tunnel would have severe damage.  相似文献   

17.
以重庆东水门大桥—千厮门大桥渝中区连接隧道为研究对象,基于UDEC软件建立离散元数值模拟分析模型,研究了城区连拱隧道施工引起的地表沉降,上部建筑物基础沉降及倾斜,新建隧道下方已有轨道六号线的变形、受力特征,并将监测数据与数值模拟进行对比分析。结果表明,连拱隧道左侧隧道上导坑施工引起的隧道拱顶沉降和基础沉降量最大,经计算上部建筑物基础最大沉降量为3.81 mm,最大倾斜量为0.02%,建筑物基础沉降量和倾斜在规范许可范围之内;隧道施工引起的地层损失使得轨道六号线左拱肩向上隆起,六号线弯矩分布规律和其变形形态基本一致,弯矩最大值位于左拱肩部位,最大值为238 kN·m;数值模拟计算结果与监测数据量值相当,变形趋势基本一致;采用UDEC软件可以准确地计算出隧道开挖过程中节理的存在对隧道周围建筑物变形的影响。  相似文献   

18.
Reasonable choice of rock strength criteria is crucial for stress and displacement prediction and support design in tunnel engineering. Based on Mogi-Coulomb strength criterion and elastic-perfectly plastic model, analytical solutions of stress and displacement for surrounding rocks around a circular tunnel were derived The intermediate principal stress coefficient was used to present the intermediate principal stress effect. The results in this study were compared with the current solutions in the literatures and the influence of intermediate principal stress and shear strength parameters of surrounding rocks was discussed. The results showed extensive applicability and the Mohr-Coulomb strength criterion and Matsuoka-Nakai criterion are two special cases; when the intermediate principal stress coefficient b was equals to 0.5, the results indicated that the intermediate principal stress effect and its range for rock strength; the influence of cohesion and internal friction angle on the plastic radius and tunnel wall displacement was significant; Care should be taken to the effects of intermediate principal stress and shear strength parameter variations of surrounding rocks on tunnel design and construction.  相似文献   

19.
Recently, the construction of neighboring highway tunnels with small interval gets more and more in China. The construction of such tunnels proceeds usually by excavating one after another. The second tunnel is constructed with the surrounding rock disturbed by the first one. And the construction of second tunnel also has effect on the first excavated one. For revealing the interaction laws of such tunnel construction in combination with the engineering practice of Lanfeng tunnel at Jinshan Road in Chongqing, The FE numerical simulation analysis was used to study the characters of surrounding rock deformation, stress field, and plastic zone of the tunnel. From this analysis, it clearly shows that the excavation of second tunnel has significant influence on the first one. This study provides a scientific basis for design and excavation of neighboring highway tunnels.  相似文献   

20.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号