首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 828 毫秒
1.
The prestressed tension is an important part of the prestressed concrete component construction.In order to find out the influence on the concrete hollow slab of different tension sequence,in this paper,the 30 m assembled post tensioning concrete hollow slab is simulated by the means of finite element analysis software ANSYS. The variation of the hollow slab's stress and strain are discussed according to the result of the different tensioning sequence, then, the reasonable sequence of tensioning prestressed steel wires is put forward.  相似文献   

2.
In order to ensure the construction quality of the massive prestressed transform beam, to prevent and control the cracking before tensioning ,the technology of casting ,methods of temperature and crack controlling are carefully analysed and theoretical calculation is carried out as well as the temperature inspection during construction ,all of which have effective results. Some prestressed construction points of transform beam are also introduced in this article, and reference advices are given at last.  相似文献   

3.
A test method of post-tensioned prestressed concrete continuous beam is presented in this paper.In the test,the prestressed secondary moment is established by adjusting middle support height.The prestressed concrete continuous beam built by the method is equivalent to the beam in practice.  相似文献   

4.
Excessive creep camber of prestressed concrete bridge would result in risk on the traffic safety in high speed railway. To control creep camber of presstressed concrete bridge, a new twice prestressed technology was proposed to presstressed concrete beam. Four twice prestressed simply supported box girders with different prestressed degrees were designed as an example. Its section stress, strength and crack resistance in different construction stages were analyzed. Compared the creep camber between conventional prestressed simply supported concrete beam and twice prestressed simply supported composite beam with the same prestressed steels, it was shown that twice prestressed composite beam has a smaller stress gradient. And the creep camber decreased approximately 40% to 60% with building height reduction, as well as some 10% energy saving and some amount of concrete.  相似文献   

5.
"Strong column with weak beam","strong beam with weak column" and"column & beam with equal strength"can be existed in one-storey prestressed concrete frames and the top storey of mult-storey prestressed concrete frames.Through the test of four prestressed concrete frames under vertical load,three kinds of prestressed concrete frames performances are studied,such as ultimate load,deflection,displacement ductility,redistribution of internal force.When the relative height of equivalent compression zone is smaller enough,the test proves that three kinds of prestressed concrete frames can realize full redistribution of internal force and have better displacement ductility,the width of cracks and deflections can satisfy the rules of code for design of concrete structures.  相似文献   

6.
The moment modulation of prestressed concrete frame has some differences compared with that of continuous beam.Based on the analysis of ratio of column linear rigidity to beam one,form of load,second moment and plastic hinge in column,this paper is intended to get some helpful advise for moment modulation design.  相似文献   

7.
A creative test method for post-tensioned prestressed frame is presented in this paper. In the test, the stationary supports at the column base are simulated and the forces at the column base can be tested while the two column bases are not connected with concrete beam. The prestressed secondary moment and the weight-produced moment are established by adjusting the support device at the column base. In this paper, the necessary conditions of the method and the basic process are recommended. It is proved theoretically that the prestressed concrete frame built by this method is equivalent to that used in practice.  相似文献   

8.
During the pre - stressing of the unbonded prestressed concrete wide flat beam - waffle slab system, the displacements and strains of slab and the prestressed concrete beams were site - measured and the results were analyzed. The prestressing construction was simulated by finite element program. The prestressing efficiency of the unbonded prestressed concrete wide flat beam - waffle slab system was discussed. It indicates that the prestressing efficiency was affected by the in -plane stiffness of slab.  相似文献   

9.
By the experimental study on a full-dimensioned prestressed frame of two spans, the relative factors are analyzed such as relative height of equivalent compression zone in critical section, secondary moment, ratio of beam rigidity to column and development of cracks in the top of columns etc., which influence the moment distribution of the post-tensioned prestressed concrete frame from the side of internal force redistribution. It is believed that that the factors of relative height of concrete equivalent compression zone and secondary moment influence the moment modulation in most degree, and ratio of column rigidity to beam also plays a part in the moment modulation to some extent. Second, the plastic joints of frame with excessive spans exit in the span which endure the whole load, at last the whole frame is destroyed because of the destruction of the loading frame, the influence to the non-loading span is little.  相似文献   

10.
To accurately simulate prestressed construction process of large-span suspendome, the initial state of construction process according to practical construction sequence is established, and the construction mechanical analysis for prestressed construction process is especially studied. Features of prestressed construction process of large-span suspendome are summarized, and the insufficiencies of the application of state variable superposition method, back analysis method, birth and death element method are analyzed. Combined with nonlinear finite element analysis method, forward algorithm for prestressed construction process based on the equivalent pre-tension is proposed, and the specific application method and procedure are given. Changzhou stadium steel roof engineering is taken as an example to verify the practicability and applicability of forward algorithm for prestressed construction process. The conclusion is that, using forward algorithm for prestressed construction process based on the equivalent pre-tension, the structure state of each construction phase can be accurately tracked, and the nonlinear contact of strut and rigid framework, interactive impact of cable force, conversion of temporary structure system, and structural geometric nonlinearity can be comprehensively considered.  相似文献   

11.
The secondary moment of prestressed concrete frame is different from that of continuous beam. In this paper,the principle and calculation method of equivalent load secondary moment and axial secondary moment are discussed,and the infection of secondary moment in moment modulation is analyzed,together with the suggestions of moment modulation for prestressed concrete frame with adopting the total control. The suggestions would be able to distinguish the advantageous and disadvantageous effect of secondary moment. Some helpful advises for moment modulation design are given in this paper.  相似文献   

12.
Based on the project of a prestressed concrete beam-slab structure,this paper introduces the optimum design of a four-spanned exceedingly long prestressed floor. Different schemes,such as the scheme of the prestressed major beam,the scheme of the prestressed secondary beam with the same span and the scheme of the prestressed secondary beam with different spacing,are compared and analyzed in this paper.Meanwhile,various methods of the exceedingly treatment for long prestressed reinforcement are compared.Finally,based on two prestressed beams,the prestress loss,the prestressing value at the ends of the beam and the deflection in the midspan of the beam are detected during the tension and anchorage stage in order to verify the results of the theoretical analysis.  相似文献   

13.
Based on the experimental study of two prestressed frames in redistribution of Internal force, it can be concluded that the dominating influence factors on moment modulation are the relative height of equivalent compression zone, the secondary moment, the ratio of beam rigidity to column and development of cracks in the top of columns.The secondary moment is very important in modulation of frames. Especially, the secondary moment will governing the modulation when the relative height of equivalent compression zone is large enough.  相似文献   

14.
For prestressed frames, the axial compression ratio will affect not only the ductility of structures but also the structural internal force.Based on the computer-calculation for four groups of 24 prestressed frames combined with the references, in this paper, the effects of axial compression ratio on the prestressed frames are studied and discussed through three aspects: the second-order effect, the axial deformation of frame-columns and the comparison with ordinary concrete frames.The study results show that the effects of axial compression ratio on the prestressed frames and the ordinary concrete frames are basically consistent, but there are some self-born characteristics.As a whole, the effect of axial compression ratio on the prestressed frames is more notable than that on the ordinary concrete frames, but under common situation the effect is small.  相似文献   

15.
In this paper, based on the structure characters and load applying means, a method called as curvature force method is put forward and proved in the nonlinear analysis of bonded prestressed concrete frame. Based on the nonlinear program, the simulation calculation was carried out on test results of two prestressed concrete frames by this method. The results from calculation are identical with the experiment ones. So it may be added to the methods for the nonlinear analysis of prestressed concrete frame.  相似文献   

16.
In this paper, the energy method has been used to study the change of the secondary moment of unbonded prestressed concrete continuous beams and it has been contrasted with bonded prestressed beams. The question, whether the secondary moment changes or not while loading, was answered. It shows that the primary secondary moment does not change when increment method is adopted to study the beams, but the total secondary moment will change while the force in prestressed reinforcement changes.  相似文献   

17.
在梁侧或梁底用波形齿横向张拉CFRP片材并锚固的体外预应力加固混凝土结构技术,对3根完全相同的7 m跨T形截面梁进行加固:其中2根梁侧面加固;1根梁底部加固。试验表明:多点锚固体外无粘结CFRP预应力可以依据构件的弯矩来调整各段的加固量从而更有效的利用CFRP材料的高强性能;梁底与梁侧加固对提高构件的抗弯刚度差别不大;波形齿能彻底解决预应力CFRP片材的锚固问题。以该3根加固梁的试验结果为基础,提出了梁体极限状态下塑性绞区长度的体外无粘结预应力碳纤维加固受弯构件的抗弯承载力公式,以及考虑二次效应的有效惯性矩法的挠曲变形的计算公式,通过与试验值的对比分析可知,所提出的方法可供设计参考使用。  相似文献   

18.
Based on the information from China and overseas,a design suggestion for moment modulation of post-tensioned prestressed concrete continuous beams with bond has been put forth in this paper. The result calculated by the suggestion is consistent with the result of varying rigidity method.  相似文献   

19.
为研究T形板肋对预制带肋底板混凝土叠合板弯曲疲劳性能的影响,对3块T形肋底板叠合板和1块整浇板进行弯曲疲劳性能对比试验,主要考察T形板肋与疲劳荷载幅值对试件疲劳破坏形态及疲劳损伤程度的影响,得到了在不同疲劳循环加载次数下的跨中动位移、混凝土应变、预应力筋应变、残余变形等,分析了在不同疲劳循环加载次数下的刚度退化情况、荷载-应变分布规律、裂缝分布规律及剩余承载力等。研究结果表明,经历200万次疲劳循环加载后,T形肋底板叠合板无明显的刚度和强度退化,增设T形板肋的叠合板能达到与整浇板相同的弯曲疲劳性能;T形肋底板叠合板正截面弯曲疲劳强度计算可采用普通预应力混凝土受弯构件正截面疲劳应力验算的4个假定,最终以此建立了其正截面弯曲疲劳强度验算方法。  相似文献   

20.
This paper presents a matrix structural analysis of variable stiffness on the complete loading history of prestressed concrete grids with unbonded tendons. A model of torsional rigidity affected by moment is derived by the analogy of space truss, and the effect of torque on flexural rigidity is also studied. In order to calculate the increment of stresses in tendons, a corresponding equation is created. Comparison of calculation shows well agreement with the experimental results.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号