首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到1条相似文献,搜索用时 0 毫秒
1.
Construction risk for water piers and foundations with double-wall steel cofferdam was analyzed by the fuzzy fault tree theory. An evaluation method of construction risk for water piers and foundations with double-wall steel cofferdam was proposed. Fuzzy fault tree of construction risk for water piers and foundations with double-wall steel cofferdam was established based on Yingwuzhou Yangtze River Bridge. 31 bottom events were considered in fuzzy fault tree model according to 2 water pier and foundation with double-wall steel cofferdam. Key process of construction risk was obtained and risk prevention measures were proposed.Results showed that fuzzy number of construction risk probability for water piers and foundations with double-wall steel cofferdam was(0.05015,0.05278,0.05542). Construction risk of 2 water pier was highest. And weld leakage, pile broken and sand boiling were the key processes with higher construction risk. There fore appropriate prevention measures would be taken to reduce the construction risk for water piers and foundations with double-wall steel cofferdam.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号