首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
To accurately simulate prestressed construction process of large-span suspendome, the initial state of construction process according to practical construction sequence is established, and the construction mechanical analysis for prestressed construction process is especially studied. Features of prestressed construction process of large-span suspendome are summarized, and the insufficiencies of the application of state variable superposition method, back analysis method, birth and death element method are analyzed. Combined with nonlinear finite element analysis method, forward algorithm for prestressed construction process based on the equivalent pre-tension is proposed, and the specific application method and procedure are given. Changzhou stadium steel roof engineering is taken as an example to verify the practicability and applicability of forward algorithm for prestressed construction process. The conclusion is that, using forward algorithm for prestressed construction process based on the equivalent pre-tension, the structure state of each construction phase can be accurately tracked, and the nonlinear contact of strut and rigid framework, interactive impact of cable force, conversion of temporary structure system, and structural geometric nonlinearity can be comprehensively considered.  相似文献   

2.
In this paper, based on the structure characters and load applying means, a method called as curvature force method is put forward and proved in the nonlinear analysis of bonded prestressed concrete frame. Based on the nonlinear program, the simulation calculation was carried out on test results of two prestressed concrete frames by this method. The results from calculation are identical with the experiment ones. So it may be added to the methods for the nonlinear analysis of prestressed concrete frame.  相似文献   

3.
In order to solve the problem that the internal force of statically indeterminate prestressed and reinforced concrete bar system structures is difficut to determine when the structures come to the non-elastic state, a simple analysis method of experimental structures' internal force-sectioned dropping rigidity method is brought forward.In this method, according to the loading state of bars, the bars are divided into limited segments by the level of rigidity dropping, and the relative level of each segment is enacted; then the dropping modulus of each segment rigidity will be found by debugging time after time, and the checking point is the key distortion which was gained from the experiment; it is considered that the internal force which is calculated by elasticity analysis at the dropped rigidity can reflect the real internal force of the structures.It is basically proved that the method, which is brought forward in this paper, is effective by comparing its results with those from the experiment of a large size prestressed frame of two spans and single floor, of which the internal force redistribution is considered.  相似文献   

4.
Now in the highway construction of the mountain area, fractured rock mass slope always strengthened by the anchor rope. In order to investigate the strengthen effect of the slope fractured rock mass strengthened by the prestressed anchor rope, laboratory similar model test was designed and preceded. By the self-made facilities, a new method of modeling prestressed anchor rope was used in the test. Nylon ropes and the aluminum flakes were used to model the anchor rope and discrete rock mass joints. Gypsum based mix material was used to model rock. According to the real slope engineering site circumstances, six sorts of different disposed prestressed nylon rope strengthened model specimens and the specimens without prestressed nylon rope were made by the similar theory. With the test results, the strength and deformation properties of different model specimens were investigated. Comparison to different anchor effects of the different model specimens was made. The final analysis shows that in order to make full use of the anchor rope's strengthen ability, anchor rope should be disposed perpendicularly to the fracture structure rock mass's main joint direction and should be placed in the upper or top area of the fractured rock mass slope.  相似文献   

5.
"Strong column with weak beam","strong beam with weak column" and"column & beam with equal strength"can be existed in one-storey prestressed concrete frames and the top storey of mult-storey prestressed concrete frames.Through the test of four prestressed concrete frames under vertical load,three kinds of prestressed concrete frames performances are studied,such as ultimate load,deflection,displacement ductility,redistribution of internal force.When the relative height of equivalent compression zone is smaller enough,the test proves that three kinds of prestressed concrete frames can realize full redistribution of internal force and have better displacement ductility,the width of cracks and deflections can satisfy the rules of code for design of concrete structures.  相似文献   

6.
To deal with failure of wet joint between a closure segment and its neighboring segments of main girder in an existing prestressed concrete cable-stayed bridge, the technology on replacement of closure segment was presented. In order to analyze structural characteristics of this technology, its technical approaches and construction key points were introduced. Then a FEM model for a typical prestressed concrete cable-stayed bridge was established, and a construction stage analysis method was given in detail, including establishing a structural basement calculation model for replacement of closure segment and simulating its construction procedures. Based upon calculation results, variations of some structural state parameters with construction stages, such as deck deflection of main girder, longitudinal horizontal displacement at the top of pylons, cable forces, were analyzed. The results showed, this method could reflect actual change process of structural state and existing inspected results of cable-stayed bridge, and FEM results could well meet with construction monitoring results during replacement of closure segment. Thus variations of structural characteristics with construction stages could actually be revealed. This method could provide references for design and construction control of replacement of closure segment in existing prestressed concrete cable-stayed bridges.  相似文献   

7.
体育馆大跨度预应力次梁楼盖竖向振动模态分析   总被引:2,自引:0,他引:2  
以重庆市铜梁县新城核心区小学建设项目3#楼(体育馆)工程为背景,对其大跨度预应力次梁楼盖竖向振动模态进行模拟分析,并与实测结果相比较,评价其控制竖向振动舒适度的效果。根据建模思路精确建立的该大跨楼盖有限元模型,其模态分析结果与模态实测结果接近,相对误差约为5%;模拟分析及工程实测结果表明,该大跨楼盖前三阶振型均以竖向振动为主,结构自振基频满足我国现行相关规范的要求,竖向振动舒适度符合标准;与无底板的大跨次梁楼盖相比,增加底板后,其增幅最小的一阶频率增长了19.9%,表明增加底板可有效地控制大跨度预应力次梁楼盖的竖向振动。  相似文献   

8.
进行了大跨径预应力混凝土刚构桥腹板开裂机理研究,基于弹性力学平面问题分析方法,推导了集中荷载作用下的板件应力函数表达式,绘制了不同受压边长与集中荷载长度比(d/a)下的横向应力曲线,拟合了集中荷载作用下构件的横向应力求解函数,构造了混凝土刚构桥腹板在预应力集中荷载作用下等效压力矩形的选取方法,并基于平面应力的表达式提出了在三维情况下沿预应力轴线的横向应力计算方法。通过建立某预应力混凝土刚构桥0~3#段实体有限元模型,分析施工过程中刚构桥混凝土腹板在不同等级预应力作用下的开裂情况。结果显示:有限元裂缝模拟与实桥腹板开裂范围一致,有限元应力分析结果下限值与推导的横向应力求解函数计算结果接近,变化趋势一致,印证了横向应力函数求解方法的正确性。  相似文献   

9.
In order to realize elastic-plastic analysis in geotechnical FEA, in this paper, firstly, the method how to realize elastic-plastic analysis in Super-Sap is discussed. Then, this paper stresses to introduce the principle and the steps used to achieve the accomplishment of elastic-plastic analysis in Super-Sap. Finally, an engineering practice is given to prove that the geotechnical FEA elastic-plastic analysis and visualized post-processing can come true by it rapidly.  相似文献   

10.
Excessive creep camber of prestressed concrete bridge would result in risk on the traffic safety in high speed railway. To control creep camber of presstressed concrete bridge, a new twice prestressed technology was proposed to presstressed concrete beam. Four twice prestressed simply supported box girders with different prestressed degrees were designed as an example. Its section stress, strength and crack resistance in different construction stages were analyzed. Compared the creep camber between conventional prestressed simply supported concrete beam and twice prestressed simply supported composite beam with the same prestressed steels, it was shown that twice prestressed composite beam has a smaller stress gradient. And the creep camber decreased approximately 40% to 60% with building height reduction, as well as some 10% energy saving and some amount of concrete.  相似文献   

11.
In this Paper,multistoryed buildings of brick and RC floor slab construction are put up on frame beam of 12. 6 m partially prestressed concrete.A test and analysis is carried out on site.It provides a new scheme for multisto-reyed and highrise buildings with beam of transitive force and transfer floor.  相似文献   

12.
A test method of post-tensioned prestressed concrete continuous beam is presented in this paper.In the test,the prestressed secondary moment is established by adjusting middle support height.The prestressed concrete continuous beam built by the method is equivalent to the beam in practice.  相似文献   

13.
A creative test method for post-tensioned prestressed frame is presented in this paper. In the test, the stationary supports at the column base are simulated and the forces at the column base can be tested while the two column bases are not connected with concrete beam. The prestressed secondary moment and the weight-produced moment are established by adjusting the support device at the column base. In this paper, the necessary conditions of the method and the basic process are recommended. It is proved theoretically that the prestressed concrete frame built by this method is equivalent to that used in practice.  相似文献   

14.
In cable structures cables are very important components. The magnitude of cable pretensioning is a vital parameter in the design of cable structures and a crucial component in controlling the construction of such structures. Developing a new sensor type is an innovative theme in the monitoring and control of cable structures construction. Based on the elastic magnetic characteristics of ferromagnetic material, we introduce a theory of an elastic magnetic method to measure cable force and developed a new flux sensor. Applying this method in the model test of an hyperbolic cable net demonstrates that it can acquire the accurate cable force value conveniently. This study can provide scientific references for structural engineering.  相似文献   

15.
The prestressed tension is an important part of the prestressed concrete component construction.In order to find out the influence on the concrete hollow slab of different tension sequence,in this paper,the 30 m assembled post tensioning concrete hollow slab is simulated by the means of finite element analysis software ANSYS. The variation of the hollow slab's stress and strain are discussed according to the result of the different tensioning sequence, then, the reasonable sequence of tensioning prestressed steel wires is put forward.  相似文献   

16.
In this paper, the energy method has been used to study the change of the secondary moment of unbonded prestressed concrete continuous beams and it has been contrasted with bonded prestressed beams. The question, whether the secondary moment changes or not while loading, was answered. It shows that the primary secondary moment does not change when increment method is adopted to study the beams, but the total secondary moment will change while the force in prestressed reinforcement changes.  相似文献   

17.
Taking a two-lane extra large bridge as sample,it is to analyze the real time thermal field and thermal effect on a long-span prestressed concrete box girder. The obtained data is compared with the simulation which is based on a balancing theory of temperature distributions and exchange in box girder exterior surfaces. The results show that the proposed method can emulate the actual boundary conditions precisely, it can satisfy the design analysis requirement of the practice engineering. Based on the emulation of the temperature field, with the ANSYS secondary development technology, FEM modules are developed to analyze the thermal field of the prestressed concrete box girder bridges. The present examples show that the developed modules are effective and useful.  相似文献   

18.
焊接加固热作用对工形截面压弯钢构件承载性能的影响   总被引:1,自引:0,他引:1  
为研究焊接加固热作用及不同初始负载对工字形压弯钢柱承载性能的影响,基于考虑热影响的热结构耦合分析方法进行了热源模型热输入改进,并考虑初始几何缺陷、初始残余应力及摩擦等,完成了不同负载下焊接加固的3个工字形压弯钢柱的模拟分析。研究了焊接位移时程、腹板应力应变重分布及荷载位移关系,通过有限元分析与相应试验结果对比验证,进而获得了试验无法获得的焊接温度场、翼缘与加固板间的焊接应力应变重分布以及翼缘边缘屈服承载力等结果,并将承载力结果与规范计算结果对比,考察了现有设计方法。结果表明,焊接顺序决定焊接变形的发展过程,焊接热输入和初始负载共同决定持载焊接的位移变化范围和焊接残余变形的大小;初始负载越大,应力应变重分布往偏心受力方向发展更多,承载力越低,而初始残余应力不影响极限承载力;采用考虑热影响的有限元方法具有一定可行性和总体安全性,规范设计方法仍有可提升空间。  相似文献   

19.
By means of revered cycle loading tests on the two specimens of short shear wall and unbonded prestressed floor system, the authors analyze the effect on the flexural strength coefficient between walls and beams of cast-in-placed slab and torsion beam. It complements the test results in terms of computer analysis. It brings forward some design method that the flexural strength ratio in this dimension structure system should be amplified than the criterion.  相似文献   

20.
A varying rigidity method is simple,convenient and accurate in analysing the statically indeterminate prestressed structures.The results from this method are verified by a series of large scale experiments.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号