功果桥(苗尾)水电站鱼类增殖站设计中的若干关键技术初探
引用本文:施家月,廖琦琛,梁银铨,吕巍,汤优敏.功果桥(苗尾)水电站鱼类增殖站设计中的若干关键技术初探[J].水生态学杂志,2009,30(6):51-56.
作者姓名:施家月  廖琦琛  梁银铨  吕巍  汤优敏
作者单位:中国水电顾问集团华东勘测设计研究院,浙江 杭州;中国水电顾问集团华东勘测设计研究院,浙江 杭州;水利部中国科学院水工程生态研究所 湖北武汉;环境保护工程部评估中心 北京;中国水电顾问集团华东勘测设计研究院,浙江 杭州
摘    要:Artificial - based fish multiplication and liberation is one of the most efficient ways for sustaining fish population, and is carrying out in the much more hydropower stations in China. In this paper, we took the Gongguoqiao & Miaowei hydropower station as an example, and aimed to briefly introduce the design process of fish hatchery. The key techniques including the multiplication and liberation size, the parent fish amounts, and the all kinds of breed facilities, were discussed, and the expected research direction was put forward.

关 键 词:Fish  hatchery  structure  Design    Key  technic    Gongguoqiao    Miaowei  hydropower  station

Key Techniques of Fish-Hatchery Designing on the Gongguoqiao & Miaowei Hydropower Station
SHI Jia-yue,LIAO Qi-chen,LIANG Yin-quan,LV Wei and TANG You-min.Key Techniques of Fish-Hatchery Designing on the Gongguoqiao & Miaowei Hydropower Station[J].Journal of Hydroecology,2009,30(6):51-56.
Authors:SHI Jia-yue  LIAO Qi-chen  LIANG Yin-quan  LV Wei and TANG You-min
Institution:Hydrochina Huadong Engineering Corporation , Hangzhou 310014 , China,Hydrochina Huadong Engineering Corporation , Hangzhou 310014 , China,Institute of Hydroecology ,Ministry of Water resources and Chinese Academy of Sciences, Wuhan 430079, China,Appraisal Center for Environment & Engineering , Ministry of Environmental Protection 100012 , china and Hydrochina Huadong Engineering Corporation , Hangzhou 310014 , China
Abstract: