简支转连续梁桥的合理施工体系转换
引用本文:张建民,岳英龙,王世杰.简支转连续梁桥的合理施工体系转换[J].东北林业大学学报,2009,37(4).
作者姓名:张建民  岳英龙  王世杰
作者单位:1. 东北林业大学,哈尔滨,150040
2. 烟台职业学院
3. 黑龙江工程学院
摘    要:从现浇段浇注顺序、后连续预应力筋的张拉顺序和临时支座的拆除顺序三方面研究了简支转连续施工体系的合理工序,从受力角度对不同施工工序进行对比分析,建议现浇浇筑和张拉的合理工序为隔端浇筑、隔端张拉.临时支座拆除的合理工序为"对称拆除".

关 键 词:先简支后连续梁  体系转换  支座

Conversion of Reasonable Construction System for Continuous Beam Turned from Simple Beam
Zhang Jianmin,Yue Yingtong,Wang Shijie.Conversion of Reasonable Construction System for Continuous Beam Turned from Simple Beam[J].Journal of Northeast Forestry University,2009,37(4).
Authors:Zhang Jianmin  Yue Yingtong  Wang Shijie
Institution:Zhang Jianmin(School of Civil Engineering,Northeast Forestry University,Harbin 150040,P.R.China),Yue Yinglong(Yantai Professional College),Wang Shijie(Heilongjiang Institute of Technology)
Abstract:The conversion of optimal construction system is studied in terms of the pouring order of cast-in-site segment,tensioning of continuous tendon and dismantling of temporary bearing.Different construction procedures are analyzed from the perspective of force.It is considered that the optimal procedure for pouring of cast-in-site segment and tensioning is interval pouring or interval tensioning,and the optimal procedure for dismantling of temporary bearing is symmetrical dismantling.
Keywords:Continuous beam turned from simple beam  System conversion  Bearing  