引用本文:贾后省,李国盛,张辉,江文渊.深部大跨度切眼顶板分区控制技术[J].保鲜与加工,2017(2):16-25.
作者姓名:贾后省  李国盛  张辉  江文渊
作者单位:河南理工大学 能源科学与工程学院, 河南 焦作 454003;煤炭安全生产河南省协同创新中心, 河南 焦作 454003,河南理工大学 能源科学与工程学院, 河南 焦作 454003,河南理工大学 能源科学与工程学院, 河南 焦作 454003;煤炭安全生产河南省协同创新中心, 河南 焦作 454003,济宁山云宇内机电科技有限公司, 山东 济宁 272400
基金项目:国家自然科学基金资助项目(51604094);河南省教育厅高等学校重点科研项目资助(16A440006)。
摘    要:针对深部大跨度切眼顶板自稳能力差、变形剧烈、支护困难等问题,以赵固二矿1105大采高工作面切眼支护为工程背景,综合现场调研、理论分析、顶板探测等方法,分析了深部大跨度切眼冒顶机理和不同顶板的控制关键,提出了以接长锚杆支护为主导的顶板分区控制技术,阐明了不同顶板分区的控制原理。据此,对赵固二矿1105切眼二次成巷进行了支护设计,并进行了顶板下沉量和顶板失稳垮落规律监测,结果表明:接长锚杆与中部层位顶板共同形成的“锚固体岩梁”呈现出较好的稳定性,各层位顶板均得到了有效控制,保证了切眼顶板安全与正常服务。

关 键 词:大跨度切眼  冒顶  分区控制  接长锚杆
收稿时间:2016/4/19 0:00:00

Hierarchical control technology for large-span set-up room roof in deep
JIA Housheng,LI Guosheng,ZHANG Hui and JIANG Wenyuan.Hierarchical control technology for large-span set-up room roof in deep[J].Storage & Process,2017(2):16-25.
Authors:JIA Housheng  LI Guosheng  ZHANG Hui and JIANG Wenyuan
Institution:School of Energy Science and Engineering, Henan Polytechnic University, Henan Jiaozuo 454003, P. R. China;Collaborative Innovation Center of Coal Work Safety;Henan Jiaozuo 454003, P. R. China,School of Energy Science and Engineering, Henan Polytechnic University, Henan Jiaozuo 454003, P. R. China,School of Energy Science and Engineering, Henan Polytechnic University, Henan Jiaozuo 454003, P. R. China;Collaborative Innovation Center of Coal Work Safety;Henan Jiaozuo 454003, P. R. China and JiningShanyunyunei Electrical Technology Co.;Shandong Jining 272400, P. R. China
Abstract:The large-span set-up room roof in deep usually has poor self-stability, acute deformation and supporting difficulties. We took the set-up room support of 1105 large-mining-height panel in Zhaogu No.2 mine as research background, analyzed the roof failure mechanism and the key of roof control in different layers through field research, theoretical analysis and roof detection, put forward a hierarchical control technology dominated by lengthened bolt support, and stated the hierarchical control principle. According to this principle, the second tunneling supporting design of 1105 set-up room in Zhaogu No.2 mine was made, and the roof convergence as well as the roof fall and failure were monitored. The results indicate that the "anchor roof beam", which is collectively formed by lengthened bolt and middle layer roof, shows good stability. And roof of every layer is controlled effectively, which well ensures the safety of set-up room roof and normal service.
Keywords:large-span set-up room  roof caving  hierarchical control  lengthen bolt