首页 | 本学科首页   官方微博 | 高级检索  
     检索      

草被覆盖阻延坡面流作用试验研究
引用本文:李勉,姚文艺,杨剑锋,陈江南,丁文峰,李莉,杨春霞.草被覆盖阻延坡面流作用试验研究[J].水土保持学报,2007,21(1):30-34.
作者姓名:李勉  姚文艺  杨剑锋  陈江南  丁文峰  李莉  杨春霞
作者单位:1. 黄河水利科学研究院,水利部黄河泥沙重点实验室,河南,郑州,450003
2. 长江科学院,湖北,武汉,430010
基金项目:国家自然科学基金委员会-水利部黄河水利委员会联合资助项目;国家重点基础研究发展计划(973计划)
摘    要:草被覆盖对坡面流有明显的阻延作用。本项研究旨在通过室内放水冲刷试验,揭示黄土丘陵区坡沟系统坡面不同草被覆盖对坡面流出流时间和终止时间的影响。试验分为坡沟系统试验及单一坡面试验2种,试验中坡面草被覆盖面积比分别为0,30%,50%,70%和90%,草被覆盖空间配置分为坡上部、坡中部和坡下部,放水冲刷流量为3.2 L/min和5.2 L/min。结果表明,坡面流出流时间与放水流量呈负相关关系,与草被覆盖面积比呈正相关关系;径流终止时间与放水流量和草被覆盖面积比均呈正相关关系;草被覆盖面积越大,其对坡面流的延滞作用越显著,放水流量越大,草被覆盖对坡面流的延滞作用越小。坡面草被布设在坡上部和坡中部时,其对坡面流的阻延作用相对较大。

关 键 词:坡沟系统  草被覆盖  出流时间  终止时间  冲刷试验
文章编号:1009-2242(2007)01-0030-05
收稿时间:2006-07-18
修稿时间:2006-07-18

Experimental Study on Delay of Grass Coverage on Overland Flow
LI Mian,YAO Wen-yi,YANG Jian-feng,CHEN Jiang-nan,DING Wen-feng,LI Li,YANG Chun-xia.Experimental Study on Delay of Grass Coverage on Overland Flow[J].Journal of Soil and Water Conservation,2007,21(1):30-34.
Authors:LI Mian  YAO Wen-yi  YANG Jian-feng  CHEN Jiang-nan  DING Wen-feng  LI Li  YANG Chun-xia
Institution:1. Yellow River Institute of Hydraulic Research, Key Laboratory of Yellow River Sediment Research of Ministry of Water Resources, Zhengzhou 450003; 2. Yangtze River Scientific Research Institute, Wuhan 430010
Abstract:Grass coverage has great influence on the stay of overland flow.The objective of this study is to reveal the influence of grass coverage on the time of runoff beginning and stop in the hillslope-gully slope erosion system on loess hilly area.In scouring experiments,five grass coverage degrees(0,30%,50%,70% and 90%),three spatial distributions of grass on the hillslope(upper,middle and lower) and two water inflow rates(3.2 L/min and 5.2 L/min) were used in the experimental soil box for the hillslope-gully slope erosion system experiment and the single hillslope experiment.Results showed that in the scouring experiments the time of runoff beginning has a negative relationship with the water inflow rate,and has a positive relationship with the grass coverage percentage.The time of runoff stop has a positive relationship with the water inflow rate and the grass coverage percentage.The delaying role of grass coverage on runoff increased with increasing grass coverage percentages and decreased with increasing water inflow rates.Usually,when the grass coverage was located on the upper and middle sections,the delaying role is relatively larger.
Keywords:hillslope-gully slope erosion system  grass coverage  time of runoff beginning  stop time of runoff  scouring experiment
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《水土保持学报》浏览原始摘要信息
点击此处可从《水土保持学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号