梯田工程概算定额编制研究
引用本文:梁其春,常福双,李鸣,卜杰华,薛顺康,田杏芳,任杨俊.梯田工程概算定额编制研究[J].水土保持通报,2001,21(5):41-44.
作者姓名:梁其春  常福双  李鸣  卜杰华  薛顺康  田杏芳  任杨俊
作者单位:黄委会黄河上中游管理局;黄委会黄河上中游管理局;黄委会黄河上中游管理局;黄委会黄河上中游管理局;黄委会黄河上中游管理局;黄委会天水水土保持试验站, 陕西西安 710043;1.黄委会黄河上中游管理局;2.黄委会天水水土保持试验站, 陕西西安 710043
基金项目:黄河防汛及治黄科技项目
摘    要:随着国家全面启动水土保持生态环境建设 ,并将其纳入基本建设管理 ,作为基础性文件之一的水土保持概算定额 ,它的编制显得越来越重要。结合《黄河流域水土保持生态工程初步设计概算编制办法及概算定额》的编制 ,就梯田概算定额的编制方法、计量单位、子目设置及步距、人工、机械、材料消耗量的确定、单价取费率和工程单价进行了论述 ,并就定额水平进行了实例分析测算 ,以检验其合理性

关 键 词:梯田工程  概算定额  施工定额
收稿时间:2001/5/19 0:00:00

A Study on Drawing up Budgetary Estimate Quota of Terraced Field
LIANG Qichun,CHANG Fushuang,LI Ming,BU Jiehu,TIAN Xingfang and REN Yangjun.A Study on Drawing up Budgetary Estimate Quota of Terraced Field[J].Bulletin of Soil and Water Conservation,2001,21(5):41-44.
Authors:LIANG Qichun  CHANG Fushuang  LI Ming  BU Jiehu  TIAN Xingfang and REN Yangjun
Institution:LIANG Qi chun 1,CHANG Fu shuang 1,LI Ming 1,BU Jie hua 1,TIAN Xing fang 1,REN Yang jun 2
Abstract:Terraced fields is one of the basis measures on soil and water conservation construction, especially on the loess plateau, in which the amount of the sloping fields is 49.2% of the total fields. Along with the nation's starting the construction of soil and water conservation overall, and putting it into capital construction, to drawing up the quota of budgetary estimate of soil and water conservation is more and more important. Combining with drawing up the way of working out the budgetary estimate and the quota of budgetary estimate of initial design on soil and water conservation project of the Yellow river basin, the way of work out the budgetary estimate of terraced fields, and the calculated unit, subtitle installed, the step distant, manpower, mechanism and consume material delimited are discussed. It talked about the rate of drawn fee to the unit price and the unit price of the project. In order to test the reasonableness of the quota of budgetary estimate, an example are taken for analysis.
Keywords:terraced fields  the quota of budgetary estimate  the quota of construction