首页 | 本学科首页   官方微博 | 高级检索  
     检索      

黄土高原小流域淤地坝系统水收支过程的数值解析
引用本文:黄金柏,付 强,桧谷治,王 斌,郑纪勇.黄土高原小流域淤地坝系统水收支过程的数值解析[J].农业工程学报,2011,27(7):51-57.
作者姓名:黄金柏  付 强  桧谷治  王 斌  郑纪勇
作者单位:1. 东北农业大学水利与建筑学院,哈尔滨,150030
2. 日本鸟取大学工学研究科,鸟取680-8552
3. 中科院水利部水土保持研究所,杨凌,712100
基金项目:中国博士后基金(特别资助:87328);国家自然科学基金项目(51009026);中组部、中科院西部之光(2006YB04);黑龙江省教育厅海外学人科研启动基金(1251H017);中日合作项目“中国内陆部沙漠化防止及其开发利用”基金
摘    要:黄土高原的淤地坝系统对各小流域水资源再分布发挥着重要的作用。为了分析淤地坝系统的年水收支过程,选取位于黄土高原北部六道沟流域的一座淤地坝系统为研究对象,基于实际的地理条件开发了该淤地坝系统水利计算模型。通过对观测地下水位数据的数值模拟,验证了模型的实用性。2006年的数值计算结果表明:地表径流量、蒸散发量、入渗量以及地下水流出量分别占淤地坝系统总来水量的36.0%、49.3%、11.6%及3.1%。由结果可知:淤地坝系统对水资源再分布的影响主要体现在减少地表径流,增加蒸发及入渗。研究为黄土高原北部淤地坝系统水文循环过程的研究提供了一种实用的数值计算方法。

关 键 词:数值分析,模型,水资源,黄土高原,六道沟流域,淤地坝系统,水收支
收稿时间:2010/12/9 0:00:00
修稿时间:2011/7/13 0:00:00

Numerical analysis of water budget process of check dam system in small basin on Loess Plateau
Huang Jinbai,Fu Qiang,Hinokidani Osamu,Wang Bin and Zheng Jiyong.Numerical analysis of water budget process of check dam system in small basin on Loess Plateau[J].Transactions of the Chinese Society of Agricultural Engineering,2011,27(7):51-57.
Authors:Huang Jinbai  Fu Qiang  Hinokidani Osamu  Wang Bin and Zheng Jiyong
Abstract:Check systems play an important role in redistribution of water resources at small basin in Loess Plateau. A check dam system which was located at Liudaogou Basin on the northern Loess Plateau was chosen as the study area to analyze annual water budget of the check dam system. A hydraulic calculation model was developed based on actual geographic conditions. Validity of the model was verified by numerical simulation of the observed groundwater level. The numerical results in 2006 showed that surface runoff, evapotranspiration, downward infiltration and groundwater outflow accounted for 36%, 49.3%, 11.6% and 3.1% of the total water inlet, respectively. The results indicated that the effects of the check dam system on the water resources redistribution were mainly in reduction of surface runoff, increase of evapotranspiration and contribution to downward infiltration. Meanwhile, the proposed numerical method for research on hydrological cycle of the check dam system on the northern Loess Plateau is practical.
Keywords:numerical analysis  models  water resources  Loess Plateau  Liudaogou Basin  check dam system  water budget
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《农业工程学报》浏览原始摘要信息
点击此处可从《农业工程学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号