首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于解析-数值结合法的傍河水源地开采方案与地下水资源量分析
引用本文:李晓媛,王文中,张春艳.基于解析-数值结合法的傍河水源地开采方案与地下水资源量分析[J].中国农村水利水电,2021(2).
作者姓名:李晓媛  王文中  张春艳
作者单位:中国地质科学院水文地质环境地质研究所;自然资源部地下水科学与工程重点实验室;华北水利水电大学
基金项目:中国地质科学院基本科研业务费(SK202009,SK202005,JYYWF20181304);国家自然科学基金项目(41807208);自然资源部研究项目(B201905)。
摘    要:合理设计开采方案对傍河水源地地下水资源开发和避免环境地质问题的发生具有重要意义。以承德市四道河典型傍河地下水水源地为研究区,在明确区域水文地质条件的前提下,建立地下水流数值模型,运用仿泰斯公式和映射叠加原理计算出合理的开采井布局,数值法与解析法相结合得到最优开采方案,确定水源地地下水可开采资源量。结果显示,在研究区4个区段内29眼开采井沿河流单排布设,井河距离为25 m,井间距离为150 m的方案为最优开采方案,水源地地下水可开采资源量为4.51万m3/d。滦河对地下水的补给充足而稳定,取水保证程度较高,对区域水环境影响较小。

关 键 词:傍河水源地  数值法  开采方案  可开采资源量

An Analysis of the Exploitation Scheme and Groundwater Resources of a Well Field at the Riverside Based on the Combination of Analytical and Numerical Method
LI Xiao-yuan,WANG Wen-zhong,ZHANG Chun-yan.An Analysis of the Exploitation Scheme and Groundwater Resources of a Well Field at the Riverside Based on the Combination of Analytical and Numerical Method[J].China Rural Water and Hydropower,2021(2).
Authors:LI Xiao-yuan  WANG Wen-zhong  ZHANG Chun-yan
Institution:(The Institute of Hydrogeology and Environment Geology,CAGS,Shijiazhuang 050061,China;Key Laboratory of Groundwater Sciences and Engineering,Ministry of Natural Resources,Shijiazhuang 050061,China;North China University of Water Resources and Electric Power,Zhengzhou 450045,China)
Abstract:Reasonable design of exploitation scheme is of great significance to the exploitation of groundwater resources and the avoidance of environmental geological problems.The study area is located in Chengde,which is a typical region along a river.Based on the clear regional hydrogeological conditions,a numerical model of groundwater flow is established.The rational well layout is calculated on the basis of the formula and mapping superposition.The optimal exploitation scheme and the exploitable resources of groundwater are obtained by combining numerical and analytical method.The results show that 29 pumping wells is along the river in 4 regions with the distance between wells of 150 m.The distance between the wells and the river is 25 m and the allowable exploitation quantity is 4.53×104m3/d.Luan River has not only sufficient and stable groundwater supply but also a higher guarantee degree of water intake.Meanwhile,this scheme has little impact on the regional water environment.
Keywords:riverside well field  numerical method  exploitation scheme  allowable exploitation quantity
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号