首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Biomass harvesting in Eucalyptus plantations in Western Australia
Abstract:Australia is at an early stage of exploring the use of forest biomass to generate energy. This study evaluated the biomass yield and the productivity rates of equipment for harvesting biomass in a poor-quality eucalypt plantation. The operation consisted of a tracked feller-buncher, grapple skidder and mobile chipper. Time study methods were used to measure the harvesting operation. A multiple regression model was constructed to predict skidding productivity. Biomass production was 63.9 t ha?1 based on the recorded load weight of eight trucks. Delays were documented and analysed. The average delay for all equipment was about 30% of working time. The study results will help guide biomass harvesting managers to estimate productivity and cost of similar operation sites.
Keywords:biomass  chipper  eucalypt plantation  feller-buncher  productivity  skidder
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号