首页 | 本学科首页   官方微博 | 高级检索  
     检索      

小水电工程可行性的模糊综合评判
引用本文:王瑞骏,张三敖.小水电工程可行性的模糊综合评判[J].中国农村水利水电,1999(12):33-35.
作者姓名:王瑞骏  张三敖
作者单位:西安理工大学水电学院!西安市,710048,宝鸡文理学院
摘    要:结合对小水电工程特点的分析,构造了进行小水电工程可行性评价的模糊层次模型,建立了对小水电工程的可行性进行模糊综合评判的方法。所建立的方法对小水电工程的可行性评价及评价方法的研究具有较好的应用参考价值。

关 键 词:小水电工程  可行性  模糊综合评判

Fuzzy Comprehensive Evaluation of Feasibility of Small Hydropower Projects
Wang Ruijun, Zhang San''ao.Fuzzy Comprehensive Evaluation of Feasibility of Small Hydropower Projects[J].China Rural Water and Hydropower,1999(12):33-35.
Authors:Wang Ruijun  Zhang San'ao
Abstract:Combining with the analysis of characteristics of small hydropower projects, a fuzzy hierarchy model evaluating feasibility of small hydropower projects is established and a fuzzy comprehensive method for evaluating feasibility of small hydropower projects is aslo built. The method presented has applied and referential value for evaluating evaluating feasibitity of small hydropower projects and for studing evaluation methods.
Keywords:small hydropower projects feasibility fuzzy comprehensive evaluation  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号