首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Parameter uncertainty analysis for probability distribution of bulk power systerm reliability
Authors:LU Jingjing  ZHAO Yuan  GUO Yin and ZHANG Xu
Institution:China Electric Power Research Institute, Beijing 100192, China;State Key Laboratory of Power Transmission Equipment & System Security and New Technology, Chongqing 400044, China;State Key Laboratory of Power Transmission Equipment & System Security and New Technology, Chongqing 400044, China;State Key Laboratory of Power Transmission Equipment & System Security and New Technology, Chongqing 400044, China
Abstract:Component reliability parameters are of uncertainty and are affected by the component type, operation time, and weather conditions. So do the reliability indices of bulk power systems. The calculation of its probability distributions and its alteration law affected by parameters uncertainty are researched to provide practical engineering reference with exploring the impact of the parameter uncertainty on reliability assessment. The point estimate method is firstly proposed based on the two-loop Monte-Carlo simulation, and then the improved Monte-Carlo simulation is presented to enhance the calculation efficiency further. Moreover, their theories, merits and faults are explained in detail. It can be seen from the evaluation results for the RBTS power systems that the accuracy of the three methods are similar but the improved Monte-Carlo simulation has the highest efficiency, followed by the point estimate method. The IEEE-RTS 79 power system is evaluated by using the improved Monte-Carlo simulation, and the results verify its validity.
Keywords:reliability  probability distribution  parameter uncertainty
点击此处可从《保鲜与加工》浏览原始摘要信息
点击此处可从《保鲜与加工》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号