首页 | 本学科首页   官方微博 | 高级检索  
     检索      

Construction Technology for the Main Bridge Pier of Citong Bridge in Quanzhou City
作者姓名:XU Si f  BEI Hang
摘    要:The Citong Bridge is located in the river estuary section with 4 meter tide range and mixed geological structure. In this paper, the technique for construction of the main bridge pier was presented in detail, which consists of the construction process, technological requirements, main construction parameters and amendment on defects. It is of great value for reference to the similar works.

关 键 词:bridge  pier  piles  construction  process  construction  technology
修稿时间:2001/8/30 0:00:00

Construction Technology for the Main Bridge Pier of Citong Bridge in Quanzhou City
XU Si f,BEI Hang.Construction Technology for the Main Bridge Pier of Citong Bridge in Quanzhou City[J].Storage & Process,2001(5):71-75.
Authors:XU Si f  BEI Hang
Abstract:The Citong Bridge is located in the river estuary section with 4 meter tide range and mixed geological structure. In this paper, the technique for construction of the main bridge pier was presented in detail, which consists of the construction process, technological requirements, main construction parameters and amendment on defects. It is of great value for reference to the similar works.
Keywords:bridge pier  piles  construction process  construction technology
点击此处可从《保鲜与加工》浏览原始摘要信息
点击此处可从《保鲜与加工》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号