首页 | 本学科首页   官方微博 | 高级检索  
     检索      

谏壁抽水站技术改造后的试运行分析
引用本文:徐付祥.谏壁抽水站技术改造后的试运行分析[J].排灌机械,2005,23(4):34-37,45.
作者姓名:徐付祥
作者单位:镇江市谏壁抽水站管理处,江苏,镇江,212003
摘    要:2003年汛后至2005年汛前谏壁抽水站主要设备进行了改造.简要介绍了改造情况,着重介绍了改造后的试运行情况,分析了试运行过程中出现的问题及其应对措施,并提出了进一步改进的建议.通过经济效益分析以及对试运行的总结分析,证明谏壁站的改造是成功的。

关 键 词:泵站  技术改造  试运行分析  谏壁
文章编号:1005-6254(2005)04-0034-04

Analyse of Trying Running After Technological Transformation of JianBi Pumping Station
XU Fu-xiang.Analyse of Trying Running After Technological Transformation of JianBi Pumping Station[J].Drainage and Irrigation Machinery,2005,23(4):34-37,45.
Authors:XU Fu-xiang
Abstract:After flood season of 2003 before flood season of 2005. The Jian Bi Pumping Station has transformed the capital equipment the article brief introduction the transform situation and key introduction running situation of trying on of equipment after transform.Have analyse that has tried question and counter measure appearing in course out and offered the suggestion of improving further. The reconstruction of pumping station is proved successful through analsysizing its economic profit and try out summary.
Keywords:Pumping Station  Technological Transformation  Test run  Analysis  JianBi
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号